MA0119 Topic 5

MA0119 Topic 5

University

12 Qs

quiz-placeholder

Similar activities

rubiks cube quiz

rubiks cube quiz

KG - Professional Development

13 Qs

Basic Nutrition

Basic Nutrition

University

10 Qs

RAPAT TELECONFERENCE

RAPAT TELECONFERENCE

12th Grade - University

10 Qs

Food Safety

Food Safety

University - Professional Development

10 Qs

KUIS 5,6,7 PEMASARAN FARMASI

KUIS 5,6,7 PEMASARAN FARMASI

University

10 Qs

Kuis GenBIRA

Kuis GenBIRA

University

10 Qs

Purification & Types of water

Purification & Types of water

1st Grade - Professional Development

15 Qs

The U.S. Government

The U.S. Government

University

12 Qs

MA0119 Topic 5

MA0119 Topic 5

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Dorothy Sim

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which standard governs bunkering operations in Singapore?

SS 524:2021

SS 600:2022

SS 648:2019

ISO 8217

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which system is recommended by SS600:2022 for measuring bunkered fuel?

Volumetric meter

Mass flow meter

Dipstick measurement

Hydrometer

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Bunker surveyors are not required to be competent or compliant under SS600:2022.

True

False

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The standard SS600:2022 was developed by the ____________.

ISO

MPA

PSA

SSA

5.

FILL IN THE BLANK QUESTION

30 sec • 2 pts

In the event of a quantity dispute, stakeholders should first document the _ _ _ _ _ _ _ _ _ _ _ (11 letters) and notify the relevant parties.

6.

REORDER QUESTION

30 sec • 4 pts

Rank the following steps in the bunkering process according to SS600:2022:

  • Pre-delivery safety meeting

Delivery of bunker

  • Measurement of fuel oil tank

Post-delivery documentation

7.

MATCH QUESTION

30 sec • 4 pts

Match the following parties with their roles in the bunkering process:

Bunker surveyor

Handles the paperwork and documentation of the bunker delivery

Cargo Officer

  • Independent measurement and quality assessment of bunker fuel

Chief Engineer

  • Ensures compliance with SS600:2022 during delivery

Bunker craft operator

Manages the onboard bunker operations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?