Topic 2 Excavation and Construction Dewatering

Quiz
•
Engineering
•
University
•
Medium
Norhazirah Imran
Used 3+ times
FREE Resource
12 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?
ground water
ground mixer
ground support
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.
equal to the angle of friction of the soil
equal to half of the angle of friction of the soil
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.
too large span
expensive
consume time
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for sands and silts?
the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for stiff clay and weak rocks?
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected
the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Construction Dewatering means to keep the excavated area ____.
Dry
Wet
Partially Wet/Dry
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.
Ditches and sumps
Well-points
Vacuum Dewatering
Deep-well Pump
Create a free account and access millions of resources
Similar Resources on Wayground
12 questions
Quiz 2 - Search

Quiz
•
University
7 questions
BMKK 2613 Chapter 2

Quiz
•
University
15 questions
Artificial Intelligence

Quiz
•
University
10 questions
Well Surveying

Quiz
•
University
10 questions
Chapter 22 - Cutting Tool Technology

Quiz
•
University
13 questions
structural framing systems

Quiz
•
University
15 questions
Exploring Intelligent Agents

Quiz
•
University
10 questions
Geology Engineering

Quiz
•
University
Popular Resources on Wayground
18 questions
Writing Launch Day 1

Lesson
•
3rd Grade
11 questions
Hallway & Bathroom Expectations

Quiz
•
6th - 8th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
40 questions
Algebra Review Topics

Quiz
•
9th - 12th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
19 questions
Handbook Overview

Lesson
•
9th - 12th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade