Topic 2 Excavation and Construction Dewatering

Topic 2 Excavation and Construction Dewatering

University

12 Qs

quiz-placeholder

Similar activities

Steel Beams

Steel Beams

University

15 Qs

GME Mixed

GME Mixed

University

7 Qs

Chapter 20 - Theory of Metal Machining

Chapter 20 - Theory of Metal Machining

University

13 Qs

Industrial Piping Quiz

Industrial Piping Quiz

12th Grade - University

14 Qs

Computer Vision

Computer Vision

University

10 Qs

6.1.3 - Engineering Drawings

6.1.3 - Engineering Drawings

10th Grade - University

15 Qs

PAVEMENT DESIGN

PAVEMENT DESIGN

University

15 Qs

1.1.3 - Scale Drawings and Drawing Techniques

1.1.3 - Scale Drawings and Drawing Techniques

10th Grade - University

15 Qs

Topic 2 Excavation and Construction Dewatering

Topic 2 Excavation and Construction Dewatering

Assessment

Quiz

Engineering

University

Medium

Created by

Norhazirah Imran

Used 3+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?

ground water

ground mixer

ground support

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.

equal to the angle of friction of the soil

equal to half of the angle of friction of the soil

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.

too large span

expensive

consume time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for sands and silts?

the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for stiff clay and weak rocks?

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected

the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Construction Dewatering means to keep the excavated area ____.

Dry

Wet

Partially Wet/Dry

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.

Ditches and sumps

Well-points

Vacuum Dewatering

Deep-well Pump

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?