Topic 2 Excavation and Construction Dewatering

Authored by Norhazirah Imran

Engineering

University

Used 3+ times

Topic 2 Excavation and Construction Dewatering
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?

ground water

ground mixer

ground support

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.

equal to the angle of friction of the soil

equal to half of the angle of friction of the soil

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.

too large span

expensive

consume time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for sands and silts?

the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For ground support installation, which of the following is the general way for stiff clay and weak rocks?

the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth

the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected

the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Construction Dewatering means to keep the excavated area ____.

Dry

Wet

Partially Wet/Dry

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.

Ditches and sumps

Well-points

Vacuum Dewatering

Deep-well Pump

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?