To conduct subsurface construction work, the earth has to be excavated and it is important to consider surrounding movements. To hold the ground surface against topple, what is needed to be installed?

Topic 2 Excavation and Construction Dewatering

Quiz
•
Engineering
•
University
•
Medium
Norhazirah Imran
Used 3+ times
FREE Resource
12 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
ground water
ground mixer
ground support
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For shallow excavation of dry sand and clay for a long-term stability, it can be acceptable to leave certain safe slope to prevent the sides of the ground against topple. The angle of the slope shall be _______.
equal to the angle of friction of the soil
equal to half of the angle of friction of the soil
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
For a large excavation, select one or more reason(s) for it to be infeasible/unsuitable to provide just a safe slope along side wall.
too large span
expensive
consume time
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for sands and silts?
the sheeting is driven up to the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For ground support installation, which of the following is the general way for stiff clay and weak rocks?
the sheeting is driven to a depth below the excavation level, then lateral bracing is connected as excavation proceeds with depth
the sheeting is installed in open or partially completed excavation to a depth below the excavation level, then lateral bracing is connected
the sheeting is installed in open or partially completed excavation up to the excavation level, then lateral bracing is connected
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Construction Dewatering means to keep the excavated area ____.
Dry
Wet
Partially Wet/Dry
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Select the dewatering process suitable for shallow excavation and water table up to a depth of 1 m.
Ditches and sumps
Well-points
Vacuum Dewatering
Deep-well Pump
Create a free account and access millions of resources
Similar Resources on Quizizz
15 questions
1.1.3 - Scale Drawings and Drawing Techniques

Quiz
•
10th Grade - University
10 questions
Desain Penyaliran Tambang Kuis 4

Quiz
•
University
13 questions
Marking Out

Quiz
•
University
15 questions
Momentum and Mass Transfer

Quiz
•
University
14 questions
QUIZ ULS - MOMENT RESISTANCE

Quiz
•
University
10 questions
IUCEE ConQuest: The Ultimate Technical Quiz Challenge

Quiz
•
University
7 questions
Reservoir Engineering

Quiz
•
University
15 questions
6.1.3 - Engineering Drawings

Quiz
•
10th Grade - University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade