Search Header Logo

NGSS.HS-ETS1-2

Authored by Wayground Content

Science

9th - 12th Grade

NGSS covered

NGSS.HS-ETS1-2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Long term research laboratory in space, constructed with resources from 15 different nations.

Space Shuttle
Space Probe
Satellite
International Space Station

Tags

NGSS.HS-ETS1-2

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

_____________ is a process that is used to systematically solve problems.

Design

Engineering

Brainstorming

Teamwork

Tags

NGSS.HS-ETS1-2

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the FOURTH step of the design process we use in IED?

Present the Solution

Generate Concepts

Develop a Solution

Construct & Test a Prototype

Evaluate the Solution

Tags

NGSS.HS-ETS1-2

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Discovering, analyzing, and finding a solution to overcome an obstacle is called

Thinking

Thinking about thinking

Problem solving

Goal setting

Tags

NGSS.HS-ETS1-2

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An architect delivers a plan for a building to a construction and engineering team. They take the end plan and break down each construction and delegate the thousands of tasks, considering the barriers that arise at each step. What kind of problem solving involves this manner of separating tasks out to find the best way to get to a goal?

Means End Analysis Problem Solving

Dissonance deregulation Problem Solving

Analogical Problem solving

Natural Problem Solving

Tags

NGSS.HS-ETS1-2

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What would be most effective in minimizing the potential damage caused by an earthquake?

Installing sirens in areas prone to earthquakes
Building structure that withstand ground vibrations.
Increasing the amount of concrete during road building
Requiring the recycling of metal and wood products

Tags

NGSS.HS-ETS1-2

NGSS.HS-ETS1-3

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Man-made embankments built to prevent the overflow of a river

Flood Plain

River

Bridge

Levee

Tags

NGSS.HS-ETS1-2

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?