Toppling Landslide Execution

Authored by Sesek Gouk

Engineering

Professional Development

Used 4+ times

Toppling Landslide Execution
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Berapa besar sudut slope untuk lereng pit di site KSM?

35

45

60

10

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Berapa lebar bench untuk galian disposal (re-handle) di pit BOB?

10

8

5

2

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Berapa besar sudut slope untuk lereng pit (soil) di site KSM?

35

45

60

10

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa warna pita patok survei untuk crest bench?

Putih Merah

Merah Hijau

Putih Kuning

Merah Putih Hijau

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa penyebab utama longsor di viewpoint BOB (B30-B32)?

Rekahan alami (insitu crack)

Dimensi lereng pit

Aktivitas blasting

Semua jawaban benar

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apakah point utama tema Minerva hours hari ini?

Ekskavasi material disposal harus sesuai design

Memahami semua potensi bahaya di area kerja kritikal

Memahami peran masing-masing sebagai eksekutor di lapangan

Semua jawaban benar

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Kapan pekerjaan di area kritikal longsor harus dihentikan, kecuali?

Ketika cuaca gerimis dan atau hujan

Ketika ditemukan crack menerus ke bawah sedalam

Ketika siang hari kondisi cuaca cerah

Ketika ada pergerakan material secara masif dan signifikan di area longsor

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?