Lesoon 16-17

Lesoon 16-17

12th Grade

10 Qs

quiz-placeholder

Similar activities

TASK 2-OCCUPATIONAL HYGIENE ( NOISE SAM)

TASK 2-OCCUPATIONAL HYGIENE ( NOISE SAM)

1st Grade - University

10 Qs

Weather, Climate and Adaptions of Animals to Climate

Weather, Climate and Adaptions of Animals to Climate

7th Grade - Professional Development

15 Qs

Phases of the Moon

Phases of the Moon

5th Grade - University

10 Qs

Gating System in Sand Casting

Gating System in Sand Casting

12th Grade

10 Qs

Inventors and Inventions

Inventors and Inventions

5th - 12th Grade

10 Qs

Simple Machines

Simple Machines

5th Grade - University

15 Qs

biome

biome

9th - 12th Grade

10 Qs

Lesoon 16-17

Lesoon 16-17

Assessment

Quiz

Science

12th Grade

Practice Problem

Easy

NGSS
MS-PS3-3, MS-ETS1-1

Standards-aligned

Created by

Катерина Гунтік

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blanks with the correct words: ___________ is the process of installing and removing sinks, toilets, and other fixtures in the bathroom, kitchen, and toilet.

installation

dismantling

pipeline works

elimination of blockages

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Fill in the blanks with the correct words: The ___________ system is responsible for carrying wastewater away from the home.

sewer

heating equipment

old pipes

supply systems

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of eliminating leaks in heating systems?

save water

prevent water damage and improve system efficiency

increase water pressure

reduce heating costs

Tags

NGSS.MS-PS3-3

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which task is specifically focused on maintaining the cleanliness and function of a building's plumbing?

plumbing restoration

sewer network maintenance

istallation and dismantling of sanitary ware

maintenance of residential and industrial buildings

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure a precise fit, first, _________ the length of the pipe.

cut off

check

measure

call a plumber

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the pipe is too long, you need to _________ it to the correct size.

remove

cut off

press

grind

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Once the alignment is confirmed, _________ the pipes and fittings with a marker for accurate positioning.

mark

degrease the end

check

connect

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?