1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Working clearance is __________.

2 M

1 M

3 M

0.50 M

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The height of contact wire in DFCC project is ___________.

7.54 m

6.60 m

8.94 m

7.80 m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of cantilever is used in outside curve location?

Push off

Pull off

Box type

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Width of 'B' Series structure in DFCC Project is-------------------.

250 mm

300 mm

225 mm

400 mm

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the spacing distance of 'A' dropper from support?

9 M

2.52 M

2.25 M

6.75 M

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Cut in insulator is not required at Section insulator and IOL locations

FALSE

TRUE

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Normal Encumbrance of a single bracket is

1.3 M

1.4 M

1.5 M

1.6 M

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development