Phase4mod6tight

Phase4mod6tight

Professional Development

7 Qs

quiz-placeholder

Similar activities

Quiz Lab RCK Des 18

Quiz Lab RCK Des 18

University - Professional Development

10 Qs

(W) Quality Test Questions on Scientific Concepts

(W) Quality Test Questions on Scientific Concepts

Professional Development

9 Qs

Unify Online Assessment

Unify Online Assessment

Professional Development

12 Qs

Tightness Testing and IGEM/UP/1B

Tightness Testing and IGEM/UP/1B

Professional Development

10 Qs

phase4mod7setting

phase4mod7setting

Professional Development

9 Qs

Phase4Mod5Pipework

Phase4Mod5Pipework

Professional Development

11 Qs

Flame and Gas Overview Training for Order Managers

Flame and Gas Overview Training for Order Managers

Professional Development

8 Qs

Phase4.mod9ECV

Phase4.mod9ECV

Professional Development

6 Qs

Phase4mod6tight

Phase4mod6tight

Assessment

Quiz

Science

Professional Development

Hard

Created by

Craig Boothright

Used 11+ times

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The permissible leakage rate for a new gas installation is:

0mb.

1mb.

2mb.

4mb.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the time period that must be allowed for a domestic tightness test?

1 min.

2 mins.

3 mins.

4mins.

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If during the initial stages of a tightness test the meter control should be found to be passing gas, what must the gas operative do?

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What equipment must be used to pin point the source of a gas escape?

A U Tube manometer.

An electronic gas detector.

Diluted washing up liquid.

Leak detector solution.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When testing a new installation with air prior to the installation of a gas supply ,it is not necessary to allow 1 minute for stabilisation:

True.

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Prior to the domestic tightness test, 1 minute is allowed to check for the meter control passing gas. If this test was not carried out, the consequences could be:

Gas may be escaping through the inlet supply.

The gas pressure could rise within the meter.

Gas that is escaping could be replaced from the supply.

Gas escaping from the service would be recorded.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If when carrying out a tightness test, the readings on each side of a U gauge are 16mb and 20mb, The pressure at which the test is carried out is:

16mb.

20mb.

18mb.

36mb.