Assestment Maintenance Training

Assestment Maintenance Training

Professional Development

10 Qs

quiz-placeholder

Similar activities

Goal setting

Goal setting

University - Professional Development

15 Qs

chess

chess

1st Grade - Professional Development

10 Qs

ASL culture

ASL culture

6th Grade - Professional Development

13 Qs

Communications 1

Communications 1

Professional Development

11 Qs

Communicate effectively in the work place

Communicate effectively in the work place

Professional Development

10 Qs

The ULTIMATE Regular Show Quiz

The ULTIMATE Regular Show Quiz

Professional Development

12 Qs

Rubiks

Rubiks

KG - Professional Development

15 Qs

Corona Virus 2020

Corona Virus 2020

Professional Development

12 Qs

Assestment Maintenance Training

Assestment Maintenance Training

Assessment

Quiz

Life Skills

Professional Development

Hard

Created by

Fanuel Christianto

FREE Resource

10 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

Why should the remote switch on the instrument panel in the dozer be turned off before disconnecting a CM2200 receiver?

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

3 mins • 1 pt

If an operator reported that a machine does not respond until the joystick has been moved to half its maximum travel, what action is required by maintenance staff to rectify this situation?

Evaluate responses using AI:

OFF

3.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are some of the common causes that may result in a disparity fault resulting in the machine shutting down?

Poorly maintained plugs and sockets.

Ingress of moisture into the connectors, etc.

Damaged leads/cables, etc.

4.

OPEN ENDED QUESTION

3 mins • 1 pt

What method does the ControlMaster CM2200 receiver use to control the proportional functions?

Evaluate responses using AI:

OFF

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

List the three methods that can be used to test the proportional outputs of the CM2200 receiver.

Using an oscilloscope to view the actual PWM signal.

Using a multimeter to measure the average dc voltage.

A test light, which will vary in intensity.

6.

OPEN ENDED QUESTION

3 mins • 1 pt

How can it be confirmed that the transmitter functions are being correctly interpreted by the ARX/CM2200 receiver?

Evaluate responses using AI:

OFF

7.

OPEN ENDED QUESTION

3 mins • 1 pt

What is the purpose or function of the RCT uninterruptable power supply located on the machine and connected to the ARX/CM2200 receiver?

Evaluate responses using AI:

OFF

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?