Search Header Logo

4. S&T SIP & CRP

Authored by CDC - COMPETENCY DEVELOPMENT CENTRE

Professional Development

Professional Development

Used 13+ times

4. S&T SIP & CRP
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Signalling interlocking plan is prepared based on approved P.Way Plan

True

False

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Signalling interlocking plan is not a scaled drawing

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IPS Design is an indoor drawing

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Cable in between location box and function is called main cable

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apparatus case full and half are indoor equipment

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

CSR of the Loop line is

715 M

725 M

735 M

750 M

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Cable Core Plan is a

Telecom document

P. Way Document

Signalling Document

Electrical document

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?