9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is NSPS ?

New Special Protection Scheme

Northern Special Protection Scheme

Northern Load Shedding Scheme

Ayer Tawar- Junjung Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many CP for NSPS 2024

4

3

2

1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is CP1 of NSPS

n-2 ATWR-BTRK and JMJG-BTRK 500kV

n-2 ATWR-JNJG 500kV L1 and L2

n-2 BGJH-PAPN 275KV L1 and L2

n-2 BMRH-JJNG 275kV L1 and L2

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Violation Circuit During N-2 ATWR-JJNG 500kV during low Northern Generation

BGJH-PAPN 275kV L1 and L2

BMRH-JJNG 275kV L1 and L2

BDOR-KSTR 275kV L1 and L2

PLPS-KSTR 275kV L1 and Line 2

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many Staggered Load Shedding Scheme available in NSPS

1 Area

2 Area

3 Area

4 Area

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Design Control Actions in NSPS , During Violation of 275kV BGJH-PAPN 275kV L1 or L2 or 275kV BMRH-JJNG 275kV L1 or L2. After 4sec are ....

Initiate HVDC Ramp Up/Back

Initiate DHIS Function

Initiate Start Up PLPS

Initiate Start Up SKPS

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why GSO need Northern SPS?

Low Northern Generation

Low Southern Generation

Low Eastern Generation

Low Central Generation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?