NSPS

NSPS

Professional Development

9 Qs

quiz-placeholder

Similar activities

Diode Tester

Diode Tester

Professional Development

10 Qs

PS1: LOAD FLOW STUDIES

PS1: LOAD FLOW STUDIES

Professional Development

10 Qs

Quiz sobre Atención de Reclamos

Quiz sobre Atención de Reclamos

Professional Development

13 Qs

Taller en casa de energías fotovoltaica

Taller en casa de energías fotovoltaica

Professional Development

10 Qs

Basic Electricity

Basic Electricity

Professional Development

10 Qs

El Ingeniero Supremo

El Ingeniero Supremo

Professional Development

9 Qs

AVO analog

AVO analog

Professional Development

10 Qs

Pre-Test MV Line & Transformer

Pre-Test MV Line & Transformer

Professional Development

10 Qs

NSPS

NSPS

Assessment

Quiz

Engineering

Professional Development

Easy

Created by

azam sams

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is NSPS ?

New Special Protection Scheme

Northern Special Protection Scheme

Northern Load Shedding Scheme

Ayer Tawar- Junjung Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many CP for NSPS 2024

4

3

2

1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is CP1 of NSPS

n-2 ATWR-BTRK and JMJG-BTRK 500kV

n-2 ATWR-JNJG 500kV L1 and L2

n-2 BGJH-PAPN 275KV L1 and L2

n-2 BMRH-JJNG 275kV L1 and L2

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Violation Circuit During N-2 ATWR-JJNG 500kV during low Northern Generation

BGJH-PAPN 275kV L1 and L2

BMRH-JJNG 275kV L1 and L2

BDOR-KSTR 275kV L1 and L2

PLPS-KSTR 275kV L1 and Line 2

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many Staggered Load Shedding Scheme available in NSPS

1 Area

2 Area

3 Area

4 Area

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Design Control Actions in NSPS , During Violation of 275kV BGJH-PAPN 275kV L1 or L2 or 275kV BMRH-JJNG 275kV L1 or L2. After 4sec are ....

Initiate HVDC Ramp Up/Back

Initiate DHIS Function

Initiate Start Up PLPS

Initiate Start Up SKPS

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why GSO need Northern SPS?

Low Northern Generation

Low Southern Generation

Low Eastern Generation

Low Central Generation

8.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are PMU in small Area (Kota Star) load Shedding Area?

PMU Kota Star

PMU KSSM

PMU OLPT

PMU JJNG

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Power Plant available in Northern Region in the System.

New Prai Power Plant

Janamanjung Power Plant

Tanjung Bin Power Plant

Kuala Langat Power Plant