NSPS

Authored by azam sams

Engineering

Professional Development

Used 1+ times

NSPS
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is NSPS ?

New Special Protection Scheme

Northern Special Protection Scheme

Northern Load Shedding Scheme

Ayer Tawar- Junjung Scheme

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many CP for NSPS 2024

4

3

2

1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is CP1 of NSPS

n-2 ATWR-BTRK and JMJG-BTRK 500kV

n-2 ATWR-JNJG 500kV L1 and L2

n-2 BGJH-PAPN 275KV L1 and L2

n-2 BMRH-JJNG 275kV L1 and L2

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Violation Circuit During N-2 ATWR-JJNG 500kV during low Northern Generation

BGJH-PAPN 275kV L1 and L2

BMRH-JJNG 275kV L1 and L2

BDOR-KSTR 275kV L1 and L2

PLPS-KSTR 275kV L1 and Line 2

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many Staggered Load Shedding Scheme available in NSPS

1 Area

2 Area

3 Area

4 Area

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What is Design Control Actions in NSPS , During Violation of 275kV BGJH-PAPN 275kV L1 or L2 or 275kV BMRH-JJNG 275kV L1 or L2. After 4sec are ....

Initiate HVDC Ramp Up/Back

Initiate DHIS Function

Initiate Start Up PLPS

Initiate Start Up SKPS

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why GSO need Northern SPS?

Low Northern Generation

Low Southern Generation

Low Eastern Generation

Low Central Generation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?