DCB30122 QUIZ

DCB30122 QUIZ

University

15 Qs

quiz-placeholder

Similar activities

Quiz on Introduction to Construction Contract

Quiz on Introduction to Construction Contract

University

15 Qs

110 Contract Quiz

110 Contract Quiz

University

10 Qs

Construction Waste Management Quiz

Construction Waste Management Quiz

12th Grade - University

15 Qs

CA Week 3 quiz in week 4

CA Week 3 quiz in week 4

University

16 Qs

Week 4 Project life cycle IMC

Week 4 Project life cycle IMC

University

16 Qs

Risk, Documents, Specifications, EIA

Risk, Documents, Specifications, EIA

University

10 Qs

Week 1 IMC

Week 1 IMC

University

16 Qs

Post-Occupancy Review and In Use - OSHA

Post-Occupancy Review and In Use - OSHA

University

10 Qs

DCB30122 QUIZ

DCB30122 QUIZ

Assessment

Quiz

Construction

University

Hard

Created by

NUR (PSA)

Used 3+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

1.      Choose the correct definition for construction industry.

The industry of carrying out building work or electrical and metal trade works.

An area of commercial enterprise such as the music industry.

The manufacture of heavy goods from raw materials.

The industry to do work.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The last stage of construction is

Designing

Commissioning

Scheduling

Planning

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the functions of CIDB is to encourage the standardization and improvement of construction techniques and materials.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A contractor is appointed at which stage?

Planning

Tendering

Briefing

Construction

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

      “It used when the client prefers a particular contractor, often because he has done satisfactory work for him before.  Usually this is for specialized work or when a particular equipment is needed as an extension of existing works for further work following a previous contract.”

The statement above referring to which tender?

Negotiable tender

Selective tender

Limited tender

Pre-qualification tender

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Testing and commissioning done by which party?

Sub-contractor

Supplier

Client

Contractor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the item that is not in tender document based on Bill of Quantities

Drawing

Bill of Quantity

Cost analysis schedule

Contractor background

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?