1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
which of the following types of drawing shows a plan view of the building site and surrounding arera
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
which of the following scales should should be used to draw a block plan
1:1250
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what piece of equipment should be used to interpret dimensions and measurements on an original working drawing
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
if an inaccuracy is found on a working drawing what action should be taken?
report to the supervisor
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what is a site datum used for?
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what does the abreviation RWP on a working drtawing stand for?
rain water pipe
Reinforced Waste Pipe
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
what must be completed before new construction work commences
laying concrete foundations
erect steel frames
removal of vegetation
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?