Search Header Logo

6035 | Communications LO2

Authored by George Harding

Professional Development

Professional Development

Used 57+ times

6035 | Communications LO2
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

STATEMENT: Manufacturers’ instructions must be followed at all times, even if they contradict the regulations and BS.

TRUE

FALSE

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select all important legislations relating to running a successful business.

Data Protection Act

Manufacturer's Certification

Freedom of Information Act

Equal Opportunity

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Timesheet

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

4.

DRAG AND DROP QUESTION

1 min • 1 pt

British Standards ​are ​ (a)   primary source of information when installing appliances. They can be overridden by ​ the (b)   ​.

not a
manufacturer's instructions
always the
sometimes the
BS institute
Codes of practice

5.

DRAG AND DROP QUESTION

1 min • 1 pt

Match the correct Building Regulations.

Part A: ​ (a)   . Part P: ​ (b)   . Part G: ​ (c)  

Part H:​ (d)   . Part L: ​ (e)  

Structure
Electrical safety
Sanitation
Drainage and waste disposal
Conservation of fuel and power

6.

DRAG AND DROP QUESTION

1 min • 1 pt

The conservation of fuel and power is categorised as:

Part L1a: ​ (a)   Part L2b: ​ (b)  

Part L1b: ​​ (c)   Part L2a: ​ (d)  

New dwellings
New buildings other than dwellings
Existing dwellings
Existing buildings other than dwellings

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Work drawing

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?