6035 | Communications LO2

6035 | Communications LO2

Professional Development

12 Qs

quiz-placeholder

Similar activities

Working onsite

Working onsite

Professional Development

10 Qs

CEFR MODULE 1

CEFR MODULE 1

Professional Development

15 Qs

Ticket Documentation

Ticket Documentation

Professional Development

7 Qs

♡2♡TALK

♡2♡TALK

Professional Development

10 Qs

PWAH - Perform Work at Height

PWAH - Perform Work at Height

Professional Development

10 Qs

Host Site Training

Host Site Training

Professional Development

9 Qs

STIV3073: Academic Writing

STIV3073: Academic Writing

Professional Development

15 Qs

GDPR Awareness

GDPR Awareness

Professional Development

9 Qs

6035 | Communications LO2

6035 | Communications LO2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

George Harding

Used 36+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

STATEMENT: Manufacturers’ instructions must be followed at all times, even if they contradict the regulations and BS.

TRUE

FALSE

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select all important legislations relating to running a successful business.

Data Protection Act

Manufacturer's Certification

Freedom of Information Act

Equal Opportunity

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Timesheet

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

4.

DRAG AND DROP QUESTION

1 min • 1 pt

British Standards ​are ​ (a)   primary source of information when installing appliances. They can be overridden by ​ the (b)   ​.

not a
manufacturer's instructions
always the
sometimes the
BS institute
Codes of practice

5.

DRAG AND DROP QUESTION

1 min • 1 pt

Match the correct Building Regulations.

Part A: ​ (a)   . Part P: ​ (b)   . Part G: ​ (c)  

Part H:​ (d)   . Part L: ​ (e)  

Structure
Electrical safety
Sanitation
Drainage and waste disposal
Conservation of fuel and power

6.

DRAG AND DROP QUESTION

1 min • 1 pt

The conservation of fuel and power is categorised as:

Part L1a: ​ (a)   Part L2b: ​ (b)  

Part L1b: ​​ (c)   Part L2a: ​ (d)  

New dwellings
New buildings other than dwellings
Existing dwellings
Existing buildings other than dwellings

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct description for: Work drawing

Completed on a weekly basis, containing details of hours worked, description of work carried out, and at which site.

Details needed by the contractor to enable them to carry out the work.

A description of the installation being quoted for, containing the materials and appliances.

The progress of the work on site, indicating a clear start and finish date for each of the trades and the activities they should be doing.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?