Search Header Logo

Midterms COMM235

Authored by Sheree Danday

Social Studies

KG

Used 1+ times

Midterms COMM235
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

where programmers eliminate any pause between the end of one program and the start of the next one -- generally at the top of the hour. The idea is to immediately get viewers involved in the next program before they are tempted to switch channels.

hotswitching

cross programming

bridging

stripping

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

involves the interconnection of two different shows. The story line of one program continues into a different program, generally with a mixture of the key people appearing in each.

hotswitching

cross programming

bridging

stripping

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is used when one TV program intentionally extends beyond the normal end point of programs on the other channels. With these programs already underway when the first program ends it discourages the audience from  changing channels and joining another program "in progress."

hotswitching

cross programming

bridging

stripping

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is used when one TV program intentionally extends beyond the normal end point of programs on the other channels. With these programs already underway when the first program ends it discourages the audience from  changing channels and joining another program "in progress."

hotswitching

cross programming

bridging

stripping

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

are popular on some local stations and on cable and satellite channels such as A&E. For example, a half-dozen episodes of Law and Order, Stargate SG1, CSI, or even the old The Twilight Zone series might be scheduled with the potential of holding loyal fans for several hours. Marathons often take place on weekends and during holiday periods when viewers are apt to have more time to watch TV.

hotswitching

cross programming

marathons

stripping

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is used when one TV program intentionally extends beyond the normal end point of programs on the other channels. With these programs already underway when the first program ends it discourages the audience from  changing channels and joining another program "in progress."

hotswitching

cross programming

bridging

stripping

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

is when episodes of the same syndicated series are scheduled Monday through Friday at the same time. Not having to wait an entire week to see the next episode of a series (as they would with first-run network series) is an attractive option to many viewers.

hotswitching

cross programming

bridging

stripping

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?