safe isolation worksheet

safe isolation worksheet

Professional Development

15 Qs

quiz-placeholder

Similar activities

Simple Past vs. Present Perfect

Simple Past vs. Present Perfect

Professional Development

10 Qs

Idioms through pictures

Idioms through pictures

Professional Development

20 Qs

Mes papiers

Mes papiers

University - Professional Development

10 Qs

Introducing Yourself and Make A Friend

Introducing Yourself and Make A Friend

Professional Development

10 Qs

New Year - partial translations

New Year - partial translations

8th Grade - Professional Development

10 Qs

Тест времена 1 курс

Тест времена 1 курс

Professional Development

20 Qs

Past Tenses

Past Tenses

University - Professional Development

13 Qs

Toefl Practice (Grammar/Skill 1-5)

Toefl Practice (Grammar/Skill 1-5)

University - Professional Development

10 Qs

safe isolation worksheet

safe isolation worksheet

Assessment

Quiz

English

Professional Development

Practice Problem

Medium

Created by

John Shermer

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What, in addition to the locking device, must be fitted at the point of lock-off?

A warning notice

A padlock

A safety cone

A danger sign

Answer explanation

In addition to the locking device, a warning notice must be fitted at the point of lock-off to alert others that maintenance is being performed, ensuring safety and preventing accidental operation.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where more than one contractor is working on an installation, how is lock-off achieved?

By using a single key lock-off device

By using a multi-key lock-off device, and each contractor fits their own lock

By using a digital lock-off system

By using a shared lock-off device

Answer explanation

Lock-off is achieved by using a multi-key lock-off device, allowing each contractor to fit their own lock. This ensures that all contractors can secure the installation independently while maintaining safety.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is an acceptable means of isolation of electrical equipment?

Circuit Breaker at Distribution Board / Consumer unit

Using a plastic cover

Taping the switch

Placing a warning sign

Answer explanation

The correct choice, 'Circuit Breaker at Distribution Board / Consumer unit', is an acceptable means of isolation as it effectively disconnects power to the equipment, ensuring safety. Other options do not provide reliable isolation.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT an acceptable means of isolation of electrical equipment?

Fuse Removal at Distribution Board / Consumer unit

Disconnection of Plug & Socket

Using a plastic cover

Switch Disconnection

Answer explanation

Using a plastic cover does not provide a reliable means of isolation for electrical equipment, as it does not disconnect the power supply. The other options effectively isolate the equipment from electrical sources.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When should a voltage indicator be tested to ensure it is functioning correctly?

Once a week

Before starting work

Immediately before and immediately after using it to test for dead

After completing work

Answer explanation

A voltage indicator should be tested immediately before and after use to ensure it is functioning correctly. This practice confirms its reliability when checking for live or dead circuits.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which test should be made to confirm that a single phase 230 V supply is dead?

Line and Neutral

Line and Earth

Neutral and Ground

Phase and Earth

Answer explanation

To confirm a 230 V supply is dead, testing between Line and Neutral is essential. If there is no voltage reading, it indicates the supply is not live. Other combinations may not provide a clear indication of the supply status.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a test to confirm a dead single phase 230 V supply?

Line and CPC

Line and Ground

Neutral and Earth

Phase and Neutral

Answer explanation

To confirm a dead single phase 230 V supply, testing between Line and CPC (Circuit Protective Conductor) ensures safety and checks for continuity. Other combinations may not provide the necessary confirmation.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?