
F50 navigation
Quiz
•
Specialty
•
University
•
Practice Problem
•
Medium
Jorgee Bonillam
Used 1+ times
FREE Resource
Enhance your content in a minute
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
To defrost the pitot static tubes we use
115VAC for all probes
115VAC for the upper ones and 28DC volts for the lower ones
lower left with 28DC emergency the others with 115vac
2.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
what does the Kenyan flag symbolize?
The color black represents the people of the Republic of Kenya, red for the oil reservess in the countri, green for the country's landscape and the white was added later to symbolize the beautiful beaches at the east
The color black represents the people of the Republic of Kenya, red for the blood shed during the fight for independence, green for the amount of lizards and the white symbolize the animal variety
The color black represents the people of the Republic of Kenya, red for the blood shed during the fight for independence, green for the country's landscape and the white fimbriation was added later to symbolize peace and honesty.
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
what is the indication in the GA mode?
Nose DN 8° and wings level
Nose UP 8° and wings level
Powers levers GA button lit
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the purpose of the Altitude alerting system?
Give an alert when the aircraft is at 10000 ft
Give an alert 2, when the aircraft deviate more than 250 for the selected altitude
Give an alert 3, when the aircraft deviate more than 250 for the selected altitude
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Before remove the stand by horizont you must
Deconect the power pack
remove all electrical power from the aircraft
stop the operation of stand by horizon at least 9 minutes before removing......so this is a coffe time
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The monitor module within the AHRS is responsible for
performs continuous testing of the AHRS unit to verify its operation and performance
performs continuous testing of the wiring interfaces to verify its operation and performance
performs continuous testing control panel and wiring interfaces operation and performance
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
How long can the power pack supply energy to the standby horizon?
1 hour
1/2 hour
3 to 4 hours
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
Formative Quiz: Radiologic Evaluation of the Ankle and Foot
Quiz
•
University
10 questions
Formative Quiz: Computed Tomography
Quiz
•
University
10 questions
Classification of Medications
Quiz
•
University
10 questions
Cooking Methods
Quiz
•
9th Grade - University
10 questions
Naruto
Quiz
•
4th Grade - University
12 questions
World mental health day
Quiz
•
1st Grade - Professio...
6 questions
Fornite Dances by Kevin and Spencer
Quiz
•
KG - Professional Dev...
15 questions
COMX 115 Exam 2 Review
Quiz
•
University
Popular Resources on Wayground
5 questions
This is not a...winter edition (Drawing game)
Quiz
•
1st - 5th Grade
15 questions
4:3 Model Multiplication of Decimals by Whole Numbers
Quiz
•
5th Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
The Best Christmas Pageant Ever Chapters 1 & 2
Quiz
•
4th Grade
12 questions
Unit 4 Review Day
Quiz
•
3rd Grade
10 questions
Identify Iconic Christmas Movie Scenes
Interactive video
•
6th - 10th Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
