ACT Retaining Structures, Groundwater, Commercial Frame Building

ACT Retaining Structures, Groundwater, Commercial Frame Building

University

10 Qs

quiz-placeholder

Similar activities

Surveyor of the week competition

Surveyor of the week competition

University

10 Qs

Week 12 quiz CC & P

Week 12 quiz CC & P

University

15 Qs

Revolutions: Themes and Impacts Quiz

Revolutions: Themes and Impacts Quiz

10th Grade - University

11 Qs

FBC: Windows

FBC: Windows

University

12 Qs

Lesson 105

Lesson 105

University

10 Qs

Carpentry Trade Terms

Carpentry Trade Terms

10th Grade - University

8 Qs

Early Construction & Industrial Revolution

Early Construction & Industrial Revolution

9th Grade - University

6 Qs

Week 2 IMC Australian economy and construction

Week 2 IMC Australian economy and construction

University

15 Qs

ACT Retaining Structures, Groundwater, Commercial Frame Building

ACT Retaining Structures, Groundwater, Commercial Frame Building

Assessment

Quiz

Construction

University

Practice Problem

Medium

Created by

Emma Coyle

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a Gravity Retaining Wall?

A vertical wall that relies on soil pressure for support

A vertical structure supported by nails

A wall that uses its own weight to resist lateral earth pressure

A wall supported by sheet piles

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which soil type has the steepest angle of repose in its drained condition?

Wet Clay

Drained Clay

Wet Sand

Dry Sand

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which one of these is a form of embedded retaining wall?

Cantilever retaining wall

CFA Piling

Sheet Piling

Gabion Baskets

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following dewatering techniques involves using electric current to move water in clayey soils?

Bored well

Freezing

Open sump pumping

ELectro-osmosis

5.

MULTIPLE CHOICE QUESTION

45 sec • 3 pts

What role does the bentonite slurry play in diaphragm wall construction?

To keep the excavator heads clean

To prevent collapse of the excavation before filling with concrete

To reduce the volume of concrete required and therefore reduce carbon footprint

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What type of soil improvement involves applying long-term loads to compress and consolidate the soil?

Surcharging

Compaction

Soil Replacement

Grouting

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In multi-storey framed commercial buildings, lateral stability is important for resisting which type of forces?

Internal wall forces

Forces due to weight of furniture

Vertical forces from floors

Horizontal forces like wind and seismic activity

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?