Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

University

10 Qs

quiz-placeholder

Similar activities

110 Contract Quiz

110 Contract Quiz

University

10 Qs

Basic Concepts and Formatting & Printing

Basic Concepts and Formatting & Printing

University

10 Qs

Roles of QS at Pre and Post Contract Stage

Roles of QS at Pre and Post Contract Stage

University

10 Qs

PPT 2 KNOWLEGDE CHECKER AND STARTER

PPT 2 KNOWLEGDE CHECKER AND STARTER

12th Grade - University

13 Qs

ECO 12/01/2025

ECO 12/01/2025

University

8 Qs

construction

construction

University

8 Qs

Civil Quiz Battle

Civil Quiz Battle

University

8 Qs

ACT Retaining Structures, Groundwater, Commercial Frame Building

ACT Retaining Structures, Groundwater, Commercial Frame Building

University

10 Qs

Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

Assessment

Quiz

Construction

University

Hard

Created by

IR AZAM

Used 4+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is NOT considered a key stakeholder in a construction project?

Project Owner

Contractor

Environmental Activist

Architect

2.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

What are the key characteristics of tilt-up construction?
(Select all that apply)

  • A) Concrete panels are poured horizontally on-site

  • B) Panels are tilted into place using a crane

  • C) High initial investment in moulds and equipment

  • D) Only suitable for small-scale projects

  • E) Faster construction for large-scale buildings

A, B & D

A, B & E

B, C & D

C, D & E

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary load transfer mechanism in end-bearing piles?
(Select the correct answer)

  • A) Skin friction along the pile’s surface

  • B) Distribution of load through surrounding loose soils

  • C) Load sharing between the pile tip and shaft

  • D) Load transfer to a strong soil or rock layer at the pile’s tip

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary role of a project owner in a construction project?

Designing the building plans

Funding the project and defining the objectives

Managing on-site construction activities

Inspecting the final construction quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 2 pts

Which of the following are advantages of the Industrialised Building System (IBS) in construction?
(Select all that apply)

  • A) Faster construction time

  • B) Reduced on-site waste

  • C) Higher labour dependency

  • D) Better quality control

  • E) Increased flexibility in design

A, B & C

A, B & D

B, C & E

C, D & E

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

How does a friction pile transfer load to the surrounding soil?
(Select the correct answer)

  • A) Through the pile's tip resting on a hard stratum

  • B) By distributing the load along the pile's entire surface through skin friction

  • C) By transferring the load entirely through the pile cap

  • D) By using reinforcement to resist bending stresses

7.

MULTIPLE CHOICE QUESTION

20 sec • 2 pts

Which of the following are types of construction plants typically used for earthmoving activities?
(Select all that apply)

  • A) Excavators

  • B) Tower cranes

  • C) Bulldozers

  • D) Dump trucks

  • E) Concrete mixers

A, B & C

A, C & D

B, C & D

C, D & E

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?