Building Machines Quiz

Building Machines Quiz

12th Grade

14 Qs

quiz-placeholder

Similar activities

CAN - CAN'T

CAN - CAN'T

University

10 Qs

LIKE AND DON'T LIKE VIDEO QUIZ

LIKE AND DON'T LIKE VIDEO QUIZ

12th Grade

16 Qs

Rich/ poor vocabulary quiz

Rich/ poor vocabulary quiz

12th Grade

15 Qs

like, alike, as

like, alike, as

12th Grade - University

12 Qs

EAP 4: Week 1 Checkpoint

EAP 4: Week 1 Checkpoint

University

10 Qs

Q:Skills Advanced Reading Unit 1 Vocabulary #1

Q:Skills Advanced Reading Unit 1 Vocabulary #1

University

12 Qs

Subject and Verb Agreement

Subject and Verb Agreement

11th - 12th Grade

12 Qs

Chunks of English language

Chunks of English language

6th Grade - University

16 Qs

Building Machines Quiz

Building Machines Quiz

Assessment

Quiz

English

12th Grade

Practice Problem

Hard

Created by

I S

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the auger in construction?

To mix concrete

To drill holes in the ground

To pump concrete

To lift heavy materials

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does a concrete mixer mix concrete?

By adding water directly

By turning a hollow drum with metal blades

By using a conveyor belt

By shaking it vigorously

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the mobile crane in the construction process?

To lower steel rods into drilled holes

To pump concrete out

To mix concrete

To fill holes with concrete

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the concrete pump do?

Drills holes in the ground

Lifts heavy materials

Fills holes with concrete

Mixes concrete

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the function of the driver's cab in a concrete pump?

To operate the pumping mechanism

To drill holes

To control the mixing process

To hold the concrete

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What materials are combined to make concrete?

Wood and metal

Water and steel rods

Chalk, stones, and sand

Plastic and glass

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the outrigger in the construction process?

To stabilize the crane

To drill holes

To mix concrete

To hold the pipe over the hole

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?