Construction and Project Management Quiz

Construction and Project Management Quiz

University

40 Qs

Similar activities

FTCE K-6 Math

FTCE K-6 Math

University

37 Qs

Sub Work 2/19/25 2nd Block

Sub Work 2/19/25 2nd Block

9th Grade - University

45 Qs

Reasoning Aptitude

Reasoning Aptitude

University - Professional Development

43 Qs

Midterm Exam in Construction Management

Midterm Exam in Construction Management

University

40 Qs

RM (PDIGS)

RM (PDIGS)

University

36 Qs

S.M.A.R.T Goals Test

S.M.A.R.T Goals Test

University

40 Qs

Unit 5 Review

Unit 5 Review

9th Grade - University

45 Qs

Project Planning and Scheduling Quiz

Project Planning and Scheduling Quiz

University

44 Qs

Construction and Project Management Quiz

Construction and Project Management Quiz

Assessment

Quiz

Created by

Will Bynum

Mathematics

University

3 plays

Medium

CCSS
HSG.MG.A.3, HSS.MD.B.5, HSA.CED.A.3

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should ideally be at the pre-construction conference?

All answers are correct

Owner (or rep), Architect, Engineers

Contractor’s PM, field staff, major subcontractors

Public utility personnel, fire marshals, and other outside parties

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the intent of partnering?

Both A and B

To gather all stakeholders early in the project to establish accepted protocol.

Create a win-win situation for everyone involved in the project.

To make an alliance with the architect in order to control the design process.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An RFI

Is a written request for clarification of a section of the plans or specifications

Asks the owner for clarification for a future team meeting time and place

Is always easily processed and answered quickly

Stands for Request for Initiation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Data, samples, details, colors, or product literature issued to the architect for approval are known as:

Submittals

RFIs

Shop drawings

Contract documents

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name for a physical model or small sample of construction to allow the architect and owner to review the appearance and function of materials, colors, textures, etc.?

Mock-up

Submittal

Shop drawing

Model

Tags

CCSS.HSG.MG.A.3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A shop drawing is typically produced by the:

Subcontractor or vendor

Owner

General Contractor

Architect

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is best practice for the general contractor to pay the subcontractor:

On time, despite the owner’s timing of payment

Only once the GC gets paid by the owner

Within 90 days of invoice

Once the project is substantially complete

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name of the document that establishes the template for measuring work progress as it relates to requests for payment?

Schedule of values

Pay request continuation sheet

Application for payment

Retainage

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name of the document that formally and officially authorizes a payment to the contractor?

Application for payment

Schedule of values

Pay request continuation sheet

Retainage

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

LDs are

Liquidated damages: A penalty assessed to the contractor for each day the projects extends beyond the necessary completion date

Lost or damaged: Material that was delivered on site, yet has either been damaged by workers or weather or has been lost/stolen

Late decline: If an architect responds to an RFI too slowly, the contractor may proceed as they like without repercussions

Like design: Where the contractor claims that what has been installed is similar enough to the design that no replacement is necessary