Search Header Logo

Construction and Project Management Quiz

Authored by Will Bynum

Mathematics

University

CCSS covered

Used 3+ times

Construction and Project Management Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should ideally be at the pre-construction conference?

All answers are correct

Owner (or rep), Architect, Engineers

Contractor’s PM, field staff, major subcontractors

Public utility personnel, fire marshals, and other outside parties

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the intent of partnering?

Both A and B

To gather all stakeholders early in the project to establish accepted protocol.

Create a win-win situation for everyone involved in the project.

To make an alliance with the architect in order to control the design process.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An RFI

Is a written request for clarification of a section of the plans or specifications

Asks the owner for clarification for a future team meeting time and place

Is always easily processed and answered quickly

Stands for Request for Initiation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Data, samples, details, colors, or product literature issued to the architect for approval are known as:

Submittals

RFIs

Shop drawings

Contract documents

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the name for a physical model or small sample of construction to allow the architect and owner to review the appearance and function of materials, colors, textures, etc.?

Mock-up

Submittal

Shop drawing

Model

Tags

CCSS.HSG.MG.A.3

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A shop drawing is typically produced by the:

Subcontractor or vendor

Owner

General Contractor

Architect

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It is best practice for the general contractor to pay the subcontractor:

On time, despite the owner’s timing of payment

Only once the GC gets paid by the owner

Within 90 days of invoice

Once the project is substantially complete

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?