5357 104 mock

5357 104 mock

Vocational training

•

30 Qs

quiz-placeholder

Similar activities

Workplace Safety Quiz

Workplace Safety Quiz

Professional Development

•

25 Qs

SUB STRUCTURE

SUB STRUCTURE

University

•

25 Qs

Quizizz Chapter 10: Refrigerants Review

Quizizz Chapter 10: Refrigerants Review

KG - University

•

25 Qs

Workshop Tools Yr 10 Winter 2025

Workshop Tools Yr 10 Winter 2025

8th Grade

•

25 Qs

PPT 6 - Installation and backflow prevention

PPT 6 - Installation and backflow prevention

12th Grade

•

27 Qs

Unit 304: Hot water systems Introduction

Unit 304: Hot water systems Introduction

KG - University

•

28 Qs

R.W CHAPTER 1 QUIZ

R.W CHAPTER 1 QUIZ

11th Grade

•

32 Qs

Site and Workshop Management Quiz

Site and Workshop Management Quiz

KG - University

•

35 Qs

5357 104 mock

5357 104 mock

Assessment

Quiz

•

Construction

•

Vocational training

•

Practice Problem

•

Medium

Created by

Michael Coyne

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document details the exact dimensions of a light fitting?

Site plans

Manufacturers data

Wiring diagram

Design specification

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document is non-statutory?

IET wiring regulations

Electricity safety quality and continuity regulations

Electricity at work regulations

Health and safety at work etc act

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How would a site supervisor be able to account for all persons on site in the event of an evacuation?

Ensure all deliveries are signed for

Ensure all escape routes are securely locked

Ensure all persons sign in when entering the site

Ensure all persons park in designated bays

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What would be the best way to identify damage to building decorations before electrical work is undertaken?

Note the damage in the site diary

Highlight the details on the invoice

Take photographs after work is undertaken

Take photographs before work is undertaken

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most appropriate method of protecting soft furnishings from dust caused by drilling a hole into a ceiling?

Vacuum clean the furnishings after the work is done

Remove furnishings and store off site

Cover furnishings with a dustsheet

Spray water over the area while drilling

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In which of the following MUST un-sheathed single core insulated cable be installed?

Metallic Trunking

Metallic Tray

Metallic Basket

PVC capping

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the MOST appropriate cable to connect a 230v handheld portable appliance to a fixed wiring system?

PVC covered in MICC

SPVC SWA

Flexible cable

Cat 6 cable

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?