
Unit 103 Short Answer Test 2 GL
Authored by Simon Evans
Construction
Vocational training
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
61 questions
Show all answers
1.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
The surface covering of a roof (the tiles for instance) is usually installed on a special covering, this covering is called a:-? (4,9,8)
(a)
2.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
What are the three materials that External 'Cavity Walls' are typically constructed with?
(a)
3.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
Why did the early solid ground floors of buildings, built in the 1930s to 1950s often have issues with rising damp ?
(a)
4.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
What are the two purposes of HONEYCOMBED SLEEPER WALL in construction in a Suspended Timber Floor
(a)
5.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
What is the name of the instrument used by surveyors to measure 'falls' in land
(a)
6.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
What is the 'two word term' used to describe systems, that use water, that has NOT been cleaned and fed to us through the Welsh Water supply system.(4.5)
(a)
7.
FILL IN THE BLANKS QUESTION
15 mins • 1 pt
What type of water would be ideal for flushing toilets(GW)?
(a)
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?