[Part 4] Midterm Exam in ME 433 (51-100)

[Part 4] Midterm Exam in ME 433 (51-100)

University

50 Qs

quiz-placeholder

Similar activities

MID SEMESTER ENGLISH ENGINEER

MID SEMESTER ENGLISH ENGINEER

University

50 Qs

Johnson Controls India Assessment Test 02

Johnson Controls India Assessment Test 02

University

50 Qs

Diagnostics Test 01 in Thermodynamics

Diagnostics Test 01 in Thermodynamics

University

50 Qs

Final Examination in MATH 153 - Part 3 (Elements)

Final Examination in MATH 153 - Part 3 (Elements)

University

50 Qs

8086 microprocessor

8086 microprocessor

University

54 Qs

Parts of Speech in Automation and Robotics

Parts of Speech in Automation and Robotics

University

50 Qs

QUIZ PTI PERTEMUAN I-III

QUIZ PTI PERTEMUAN I-III

University

45 Qs

Unit 3.2 – Pumps

Unit 3.2 – Pumps

University

47 Qs

[Part 4] Midterm Exam in ME 433 (51-100)

[Part 4] Midterm Exam in ME 433 (51-100)

Assessment

Quiz

Engineering

University

Hard

Created by

Engr. RSR

Used 1+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What fitting may only be used for vertical to horizontal change of direction drainage piping when installed in true vertical position?
Wye
60 degree bend
90 degree bend
Combination wye

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which fixture do not require cleanout on its horizontal drain having a length of less than 1.5 m?
Bathtub
Sink
Urinal
None of the these

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The administrative authority requires that every request for inspection be filled at how many days before such inspection is intended?
3 calendar days
5 working days
3 working days
5 calendar days

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Elevated or gravity storage tank shall be vented with a return bend vent pipe having an area not less than the area of the _____.
up feed riser pipe
fixture supply pipe
down feed riser pipe
building supply pipe

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Void between pipes and sleeves through concrete floor in the ground shall appropriately sealed with _____?
epoxy
bitumen
oakum
solder

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Portion of vent pipe through which wastewater also flows through.
Dry vent
Wet vent
Stack vent
Vent stack

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

ANSI means _____.
American National Standard Institute
Association of National Sewerage International
Authority of National Sanitary Institute
American National Sewerage Institute

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?