[Part 4] Midterm Exam in ME 433 (51-100)

[Part 4] Midterm Exam in ME 433 (51-100)

University

50 Qs

quiz-placeholder

Similar activities

Philippines Power Systems

Philippines Power Systems

University

50 Qs

BSEC

BSEC

1st Grade - University

50 Qs

B.Sc., High Performance Fibers

B.Sc., High Performance Fibers

University

52 Qs

13.3.1 - Civil Engineering Applications - Bridges

13.3.1 - Civil Engineering Applications - Bridges

10th Grade - University

50 Qs

PASGT Final Req

PASGT Final Req

University

50 Qs

Round 1 STARBURST START

Round 1 STARBURST START

University

50 Qs

Types of Engines Quiz

Types of Engines Quiz

10th Grade - University

54 Qs

PRESSURE CHANGE MEASUREMENT TESTING METHOD I

PRESSURE CHANGE MEASUREMENT TESTING METHOD I

7th Grade - University

55 Qs

[Part 4] Midterm Exam in ME 433 (51-100)

[Part 4] Midterm Exam in ME 433 (51-100)

Assessment

Quiz

Engineering

University

Hard

Created by

Engr. RSR

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What fitting may only be used for vertical to horizontal change of direction drainage piping when installed in true vertical position?
Wye
60 degree bend
90 degree bend
Combination wye

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which fixture do not require cleanout on its horizontal drain having a length of less than 1.5 m?
Bathtub
Sink
Urinal
None of the these

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The administrative authority requires that every request for inspection be filled at how many days before such inspection is intended?
3 calendar days
5 working days
3 working days
5 calendar days

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Elevated or gravity storage tank shall be vented with a return bend vent pipe having an area not less than the area of the _____.
up feed riser pipe
fixture supply pipe
down feed riser pipe
building supply pipe

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Void between pipes and sleeves through concrete floor in the ground shall appropriately sealed with _____?
epoxy
bitumen
oakum
solder

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Portion of vent pipe through which wastewater also flows through.
Dry vent
Wet vent
Stack vent
Vent stack

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

ANSI means _____.
American National Standard Institute
Association of National Sewerage International
Authority of National Sanitary Institute
American National Sewerage Institute

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?