309 Sanitation Systems 3 Quiz

309 Sanitation Systems 3 Quiz

KG

20 Qs

quiz-placeholder

Similar activities

Hot Water PowerPoint 1 Questions

Hot Water PowerPoint 1 Questions

10th Grade

15 Qs

M7: Review Questions (26307-20)

M7: Review Questions (26307-20)

12th Grade

15 Qs

Construction Contract - Delay & EOT

Construction Contract - Delay & EOT

University

20 Qs

Health and Safety week 3

Health and Safety week 3

KG - University

15 Qs

Electrical power point 3 2025

Electrical power point 3 2025

KG - University

18 Qs

OSHA & Production Safety Quiz

OSHA & Production Safety Quiz

9th - 12th Grade

15 Qs

Health and Safety Regulations Part 1

Health and Safety Regulations Part 1

KG - University

19 Qs

Greywater & McHP

Greywater & McHP

2nd Grade - University

15 Qs

309 Sanitation Systems 3 Quiz

309 Sanitation Systems 3 Quiz

Assessment

Quiz

Construction

KG

Practice Problem

Easy

Created by

Darren Harvey

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where are the statutory requirements for the installation of drainage systems?

BS 6700

BS EN 12056

Building regulations

WRAS

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Identify this type of stack system.

Primary ventilated stack

Secondary ventilated stack

Ventilated discharge branch stack

Stub stack

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a discharge branch has a gradient of 18mm per metre and the branch is 3 metres in length, what will the vertical drop distance be?

54mm

18mm

36mm

72mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the purpose of the component shown below, when installed at the base of the stack?

To prevent evaporation

To prevent backflow

To prevent expansion

To prevent compression

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum recommended length of a discharge pipe from a bath connected to a primary ventilated stack is:

3 metres

4 metres

5 metres

6 metres

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended termination, as per building regulations, for a soil stack inside a building?

Open ended

Cowl

Domical cage

Air admittance valve

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum sized waste that is allowed to be fitted to a wash basin?

32mm

40mm

50mm

100mm

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?