Copper pipework CP-1

Copper pipework CP-1

Vocational training

20 Qs

quiz-placeholder

Similar activities

Bpec Low Carbon Steel

Bpec Low Carbon Steel

KG - University

20 Qs

PPT 7 - Prepare for the installation of systems and components

PPT 7 - Prepare for the installation of systems and components

12th Grade

21 Qs

unit 113 powerpoint 3

unit 113 powerpoint 3

10th Grade

21 Qs

Hot Water

Hot Water

KG - University

20 Qs

305 Cold Water systems  2 Quiz

305 Cold Water systems 2 Quiz

2nd Grade

20 Qs

CPP Quiz

CPP Quiz

KG - University

18 Qs

unit 113 powerpoint 3

unit 113 powerpoint 3

10th Grade

18 Qs

Power Tools, fixings and components

Power Tools, fixings and components

KG - University

16 Qs

Copper pipework CP-1

Copper pipework CP-1

Assessment

Quiz

Construction

Vocational training

Easy

Created by

paul martin

Used 14+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

List 3 Tools that you would use for measuring and marking out.

Pipe Bender/Adjustable spanner/File

Tape measure / Hacksaw / Blowtorch

Pencil / Pipe Slice / Spirt Level

Tape Measure / Pencil / Spirt Level

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following two pipe sizes are most commonly found in domestic plumbing systems

15mm/22mm

32mm/40mm

1/2inch 3/4 inch

28mm/35mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An Integral soldering fitting used to reduce a larger pipe to a smaller pipe

Media Image
Media Image
Media Image
Media Image

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An end feed soldered fitting that would join three pipes,one smaller than the other two

Media Image
Media Image
Media Image
Media Image

5.

DRAG AND DROP QUESTION

1 min • 1 pt

The Information required to fabricate copper pipe to a given dimension is called ​ (a)  

Pipe work installation drawing
Location plan 
Material schedule 
Bill of quantities 

6.

DRAG AND DROP QUESTION

1 min • 1 pt

A pipework installation drawing is often accompanied by a ​ (a)  

Material schedule
Location plan 
Pipework installation plan 
Bill of quantities 

7.

DRAG AND DROP QUESTION

1 min • 1 pt

Check that the pipe ​ (a)   are free from ​ (b)   before cutting

ends
damage
Tape measure 
700mm

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?