OPM_Quiz1

OPM_Quiz1

University

20 Qs

quiz-placeholder

Similar activities

Site Supervision Quiz

Site Supervision Quiz

University

15 Qs

Calgary's Shaganappi Bridge

Calgary's Shaganappi Bridge

10th Grade - University

20 Qs

Industrial Engineering Quiz

Industrial Engineering Quiz

University

23 Qs

Diversity In Engineering: College Readiness Quiz

Diversity In Engineering: College Readiness Quiz

University

17 Qs

Technical Quiz

Technical Quiz

University

25 Qs

6.1.3 - Engineering Drawings

6.1.3 - Engineering Drawings

10th Grade - University

15 Qs

PEISS

PEISS

University

15 Qs

OPM_Quiz1

OPM_Quiz1

Assessment

Quiz

Engineering

University

Hard

Created by

Khairul MatSaad

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary role of the Project Management Office (PMO) in offshore engineering projects?

Performing daily maintenance activities

Establishing and implementing project management standards

Overseeing construction quality

Designing offshore structures

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the purpose of pre-commissioning checks in offshore projects?

Designing subsea systems

Verifying system integrity before startup

Installing safety equipment

Mapping geological formations

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In project scheduling, what does the Work Breakdown Structure (WBS) help achieve?

Defining the scope of work in hierarchical levels

Estimating the duration of tasks

Optimizing resource utilization

Identifying critical risks

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following technologies has significantly improved pipeline inspection in offshore engineering?

Underwater welding

Advanced drilling rigs

Unmanned submersibles and drones

Jack-up platforms

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the key responsibility of the engineering manager in an offshore project?

Procurement of materials

Leading risk assessment efforts

Ensuring all technical requirements are met

Managing stakeholder communication

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary challenge associated with offshore storage facilities?

Accessibility and environmental protection

Limited access to fresh water

High operational costs for onshore materials

Inadequate safety regulations

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Why is stakeholder engagement crucial in offshore projects?

To expedite project timelines

To reduce project budgets

To ensure alignment and minimize conflicts

To streamline procurement processes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?