Understanding the RIBA Plan of Work

Understanding the RIBA Plan of Work

KG

10 Qs

quiz-placeholder

Similar activities

Resource and Technology

Resource and Technology

8th Grade

14 Qs

Product Planning & Development Vocabulary uiz

Product Planning & Development Vocabulary uiz

12th Grade

15 Qs

N5 Manufacturing Processes

N5 Manufacturing Processes

12th Grade

14 Qs

7th Gr. Unit 1 Lesson 1 Review

7th Gr. Unit 1 Lesson 1 Review

7th Grade

14 Qs

ELCD

ELCD

University

10 Qs

Level 2 Health and Safety - Legislation

Level 2 Health and Safety - Legislation

12th Grade

14 Qs

SYSTEMS DEVELOPMENT AND PROGRAM CHANGE ACTIVITIES

SYSTEMS DEVELOPMENT AND PROGRAM CHANGE ACTIVITIES

University

15 Qs

Tools for projects

Tools for projects

1st - 10th Grade

10 Qs

Understanding the RIBA Plan of Work

Understanding the RIBA Plan of Work

Assessment

Quiz

Other

KG

Hard

Created by

E Bradley

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary objective during the Strategic Definition stage of the RIBA Plan of Work?

Develop detailed architectural plans

Identify the needs of the community and the objectives of the project

Create initial design concepts

Oversee the construction process

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which stage of the RIBA Plan of Work are feasibility studies and initial cost estimates conducted?

Preparation and Briefing

Concept Design

Strategic Definition

Handover

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the Preparation and Briefing stage, what is developed in consultation with stakeholders?

Initial design concepts

Detailed project brief

Construction drawings

Post-project review

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus during the Concept Design stage?

Finalise detailed construction drawings

Monitor the building's performance

Create initial design concepts and sketches

Conduct final inspections

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which stage involves coordinating with engineers and other consultants to integrate structural, mechanical, and electrical systems?

Developed Design

Technical Design

Manufacturing and Construction

Use

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary task during the Technical Design stage?

Oversee the construction process

Develop detailed architectural plans

Finalise detailed construction drawings and specifications

Conduct feasibility studies

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During which stage are tender documents prepared for contractors?

Strategic Definition

Technical Design

Handover

Use

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Other