Measure Phase

Measure Phase

Professional Development

8 Qs

quiz-placeholder

Similar activities

Implementasi Kurikulum Merdeka IGI Musi Rawas

Implementasi Kurikulum Merdeka IGI Musi Rawas

Professional Development

10 Qs

PRE-TEST IHT PENYUSUNAN MODUL AJAR MGMP B.ING SMP MEMPAWAH

PRE-TEST IHT PENYUSUNAN MODUL AJAR MGMP B.ING SMP MEMPAWAH

Professional Development

10 Qs

Berkobar Kalteng 2024

Berkobar Kalteng 2024

Professional Development

10 Qs

Observasi dan Pelatihan Pembelajaran di PAUD Alam

Observasi dan Pelatihan Pembelajaran di PAUD Alam

Professional Development

13 Qs

PT716A_Day 14_18601917108_six sigma in pharmaceutical indust

PT716A_Day 14_18601917108_six sigma in pharmaceutical indust

University - Professional Development

10 Qs

TEST MC MPS

TEST MC MPS

Professional Development

10 Qs

Capaian Pembelajaran

Capaian Pembelajaran

Professional Development

10 Qs

Capaian Pembelajaran

Capaian Pembelajaran

Professional Development

10 Qs

Measure Phase

Measure Phase

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

fahmi ramadhan

Used 2+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the measure phase, what kind of tools we mainly talk about?

control chart, process capability

fmea, project charter

DOE, project charter

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You cannot improve if you cannot measure is the slogan from?

Takunci

Taguchi

Takana Juo

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2 types of measurement variation?

gauge variation and operator variation

common cause variation and operator variation

common cause and special cause variation

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Variation from measurement on the same part, same characteristic, same operator/appraiser is called?

Reproducibility

Repeatability

Disability

Linearity

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the gage R&R is 40%, what is the decision?

Accepatable

Unacceptable and should be corrected

May be acceptable

Accepatable and should be corrected

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Low, Middle, High is kind of ... data?

Binary

Nominal

Ordinal

Big

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which type of control chart if it has more than 10 subgroups?

Xbar R

Xbar S

Xbar T

I-MR

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is the process could be said capable?

Cp =0.5

Cp =1

Cp =0

Cp = 0.75