Which of the following is NOT associated with tester motivation?

ISTQB Advance Level Test Manager 2nd

Quiz
•
Professional Development
•
Professional Development
•
Medium
junaid amjad
Used 3+ times
FREE Resource
65 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Recognition
Management approval
Adequate rewards
Pairwise testing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
IEEE 10440-1993 specifies a standard for defect reporting. Which of the following attributes should be in a defect report as per ISTQB Syllabus?
Complete, concise, accurate and objective report
Compete and accurate. Does not have to be concise or objective.
Complete and objective. Does not have to be accurate.
Accurate. Does not have to be complete, concise or objective.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following best describes a difference between a sequential development model and an iterative one?
A sequential development model will always take longer than an iterative model, for a similar sized project.
A sequential development model guarantees that the customer will like the product, while the iterative model does not.
A sequential development model involves the users in testing mostly at the end of development, while the iterative model concentrates on the user perspective throughout development.
A sequential development model requires significant regression testing, while an iterative model does not.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following are included in test plans?
I. A schedule of test activities
II. The set of test cases to be run.
III. The roles and responsibilities of stakeholders.
IV. The test data.
V. The test results and incidents raised.
II and III
II, IV and V
I and III
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following would give the best measure of progress against product quality?
The number of tests run against those planned.
The turnaround time for defects.
The number of high priority defects outstanding.
The time taken to run each test.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In which order should the following test management documentation be
created?
I. Project master test plan
II. Test strategy
III. Test policy
IV. Level test plan
I, II, III, IV
II, I, III, IV
III, II, I, IV
I, IV, III, II
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a test policy statement?
ToolX within the Efficient tool set will be required for this project.
Projects across the company will make use of the Efficient toolset.
Training will be required in ToolX for staff on this project.
ToolX will be required for a period of one month.
Create a free account and access millions of resources
Similar Resources on Quizizz
70 questions
Sample Exam 1

Quiz
•
Professional Development
67 questions
Google Level 2

Quiz
•
Professional Development
60 questions
PMP 380 mock questions - Full mock - part 2

Quiz
•
Professional Development
70 questions
ISTQB technical test analyst advance level

Quiz
•
Professional Development
60 questions
English Language Diagnostic Assessment by the Technology

Quiz
•
Professional Development
69 questions
Pribadi Analisis Sistem Informasi

Quiz
•
Professional Development
60 questions
JOE 13 Scrum Foundation 3

Quiz
•
Professional Development
70 questions
Fundamental of Computer Principles (2023 Final's PREP) sem 1

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade