GMJ 9189 phase 2 cold water pressure testing and flushing

GMJ 9189 phase 2 cold water pressure testing and flushing

Vocational training

15 Qs

quiz-placeholder

Similar activities

Chapter 7 contracts

Chapter 7 contracts

University

17 Qs

substructure quiz

substructure quiz

KG - University

10 Qs

Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

12th Grade

20 Qs

Intro to Drafting

Intro to Drafting

University

15 Qs

L1 Setting out buildings

L1 Setting out buildings

11th Grade

14 Qs

Construction PPE

Construction PPE

KG - University

15 Qs

Basic Concepts and Formatting & Printing

Basic Concepts and Formatting & Printing

University

10 Qs

Sustainable Construction Quiz

Sustainable Construction Quiz

KG - University

15 Qs

GMJ 9189 phase 2 cold water pressure testing and flushing

GMJ 9189 phase 2 cold water pressure testing and flushing

Assessment

Quiz

Construction

Vocational training

Hard

Created by

Glen Johnson

Used 17+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the required internal water pressure for water fittings as per the Water Supply (Water Fittings) Regulations 1999?

A. 1.1 times the maximum operating pressure

B. 1.5 times the maximum operating pressure

C. 2 times the maximum operating pressure

D. 1.3 times the maximum operating pressure

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to WRAS guidance, what is the testing duration for rigid pipe systems without further pumping?

A. 30 minutes

B. 1 hour

C. 2 hours

D. 90 minutes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In BS EN 806, what is the formula for calculating the maximum design pressure (MDP)?

A. 1.5 × maximum operating pressure

B. 2 × maximum working pressure

C. 1.65 × maximum operating pressure

D. 1.1 × maximum operating pressure

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a system with a maximum working pressure of 5 bar, what is the test pressure recommended by BS EN 806?

A. 7.5 bar

B. 6.5 bar

C. 8.25 bar

D. 10 bar

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During pre-commissioning checks, which of the following is NOT required?

A. Checking that all joints are made correctly

B. Ensuring adequate pipe supports

C. Testing with maximum allowable pressure

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material requires pressure testing as per BS EN 806?

Copper tubes

Plastic pipes

Steel pipes

PVC pipes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In WRAS Test A for plastic pipes, what is the final step?

Reducing pressure to one-third of the test pressure for 90 minutes

Pumping for 1 hour

No pressure drop for 120 minutes

Checking for leaks at full pressure

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?