
Level 0 and 1 DFD and Related Concepts
Authored by Waqqad Rasheed
Computers
12th Grade
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
9 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main focus of a Level 0 Data Flow Diagram (DFD)?
Showing the processes in a sequential order
Describing the detailed database structure of the system
Representing data flows between external entities and the system as a whole
Illustrating the hardware used in the system
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a key element that must be present in any data flow diagram?
User roles and permissions
Data flows, processes, and external entities
Programming code for each process
A detailed hardware specification
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is true about data flows in a Level 0 DFD?
They can represent physical objects like receipts or invoices.
They must always have a direction and connect an external entity to the system or a process.
They show how the system processes data internally.
They depict the exact storage location of data.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a rule for creating Level 0 DFDs?
Every data flow must connect directly to a data store.
Processes are optional and may not always be needed.
External entities must only interact with the system through data flows.
Physical processing steps must be represented.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a Level 0 DFD?
To describe the physical layout of the system's components
To break down the system into detailed processes
To provide a high-level view of the system and its interactions with external entities
To list all data types used in the system
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why must every data flow in a DFD be connected to a process?
To ensure that the data is stored properly
To show that processes transform data in some way
To display the sequence of steps in a process
To represent the network's physical structure
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the car hire company scenario, what does the process "Take Payment" represent in the Level 0 DFD?
An external entity interacting with the system
The storage location for payment data
A transformation of input data (payment details) into output data (receipt)
The entire car hire system
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?