
Creating a Base Plan
Authored by Charity Etchelecu
Specialty
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
What should be used to plot the rough sketch before drawing the final plot plan?
Tracing paper
Graph paper
Tissue paper
Both A and C
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of using a line (reference line) along one side of the house?
To locate reference points
To measure property lines
To draw a compass
To construct a plot plan
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be noted first in step five of preparing a base plan?
Compass
Easement
Property line
Street edge
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which feature is measured from the back edge of the curb or edge of street?
Property line
House corner
Street edge
Easement
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following features should be included in the base plan drawing?
Existing walks
Terraces
Outbuildings
All of the above
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Diagram and place space needs. True or False?
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An outdoor living area should be large enough for the use it will receive. True or False?
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?