PART VII - DRAINAGE STRUCTURES

PART VII - DRAINAGE STRUCTURES

University

19 Qs

quiz-placeholder

Similar activities

BSE June 2022 paper C

BSE June 2022 paper C

University

21 Qs

Chapter 6: Energy and Matter Review

Chapter 6: Energy and Matter Review

University

20 Qs

Hot Water - PPT 4 - Instantaneous hot water heaters

Hot Water - PPT 4 - Instantaneous hot water heaters

12th Grade - University

21 Qs

Week 2 IMC Australian economy and construction

Week 2 IMC Australian economy and construction

University

15 Qs

Understanding the RIBA Design Stages

Understanding the RIBA Design Stages

University

20 Qs

Week 12 quiz CC & P

Week 12 quiz CC & P

University

15 Qs

Week 11 quiz CC & P

Week 11 quiz CC & P

University

15 Qs

Quiz Ukur Bahan

Quiz Ukur Bahan

University

20 Qs

PART VII - DRAINAGE STRUCTURES

PART VII - DRAINAGE STRUCTURES

Assessment

Quiz

Construction

University

Easy

Created by

Joy Tudawerld

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

IT IS MEANT TO STABILIZE THE FOUNDATION BED TO AVOID ANY POSSIBLE SETTLEMENT THAT MIGHT IMPAIR THE FUNCTION OF THE DRAINAGE STRUCTURE AND ALSO TO SERVE AS A UNIFORM CUSHION TO THE CULVERT

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

IF THE UNDERLYING SOIL AT THE DESIGNED BOTTOM GRADE OF THE CULVERT IS COMPOSED OF SUITABLE MATERIAL, IT SHOULD BE REMOVED REMOVED AND SUBSTITUTED WITH GRANULAR FILL COMPOSED OF SAND OR SANDY SOIL.

TRUE

FALSE

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

NORMAL THICKNESS OF FOUNDATION FILL

20 cm

25 cm

22 cm

20 mm

4.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

WHAT CAN BE USED TO SPREAD MANUALLY THE FOUNDATION FILL UNTIL THE WHOLE FOUNDATION BED IS COVERED, AS REQUIRED? (SELECT AS MANY)

RAKES

SHOVEL

COMPACTOR

SCRAPERS

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FOR _ CULVERTS, THE LAYERS ARE OF UNIFORM FLAT THICKNESS.

BOX

PIPE

CIRCULAR

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

______ ARE INSTALLED IN THE ORIGINAL STREAMBED WITH THEIR GRADES AND FLOW LINE CONFORMING TO THE NATURAL CHANNEL OR CANAL..

BOX

PIPES

CIRCULAR

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

WHICH IS TRUE IN THE STATEMENTS GIVEN?

FOR BOX CULVERTS, THE BEDDING IS SHAPED SO THAT THE BOTTOM OF THE PIPE WILL BE IN CONTACT THROUGHOUT ITS FULL LENGTH.

FOR CIRCULAR PIPES, THE BEDDING IS SHAPED SO THAT THE BOTTOM OF THE PIPE WILL BE IN CONTACT THROUGHOUT ITS FULL LENGTH.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?