
ACR204-Unit 38 Test Questions (CRF) - Mr. Graham
Authored by Randall Graham
Professional Development
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When connecting round metal duct sections, a minimum of ___ self-taping sheet metal screws should be used.
2
4
5
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The applied voltage (the voltage that the unit will actually be drawing) should be within ___% of the rated voltage of the unit.
7
5
3
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A disconnect or shutoff switch should be installed within ____ feet of each unit and within sight of the unit.
20
15
10
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
18-4 low-voltage wire is ________.
4-gauge wire with a current rating of 18 amps
14-gauge wire with a current rating of 4 amps
18-gauge wire, 4 total allowed in ½ inch conduit
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An air conditioner in a climate with average humidity will collect about 3 pints of condensate per hour of operation for each ton of air-conditioning.
True
False
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A _______ is located in an auxiliary drain pan and is wired in series with the low voltage power supply.
pressure switch
delay timer
auxiliary thermostat
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Line sets come in standard lengths of _______.
10 feet and 15 feet
15 feet and 35 feet
50 feet and 100 feet
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?