Search Header Logo

Sharing Knowledge SCA Telkomsat_HOP ACS 1

Authored by Andri Kusuma

Science

Professional Development

10 Questions

Used 1+ times

Sharing Knowledge SCA Telkomsat_HOP ACS 1
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is HOP ACS 1 procedure?

Alternate ACE Checkout

Alternate STR Checkout

Primary Processor Checkout

Alternate Bus Adapter Checkout

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Below is the correct statement of the recommended HOP ACS 1 schedule, except

should be executed every 2 years

Can be Called from COP

Should be Performed after equinox season

Should be Performed during equinox season

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Below is the list of procedures that call HOP ACS 1, except

. COP ACS13, Anomalous Gyro Behavior

. COP ACS3, ACS FDIR Monitor Trip

HOP ACS 6, Alternate STR Checkout

. HOP ACS5, Sun Sensor Health Monitoring

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

During nominal MPSAT condition, based on the chart, what step should we choose after entering step 2.1?

Go to Step 2.5

Go to Step 2.2

Go to Step 2.7

Go to Step 1

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Why do we have to change the swap ACE configuration on the primary processor to be the same as the active ACE during execution of this procedure? All the statements below here is correct except

To avoid the possibility of two processors being configured as Bus Controllers to the same ACE in the event of an FDIR trip

To allow a predictable path to elevate FDIR to a processor swap

To prevent two processors attempting to communicate to the same ACE as Bus Controllers

To Collect data from primary ACE

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Below are the list of ACE trays that are monitored by the ACE MBUS Global and Individual Monitors, except

Sensors

Thrusters

Reaction Wheels

MPS and LSE Trays

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During the step where the operator should Plot RW Data for each RW for 5 mins from both processors, these telemetries should be monitored by Operator except

RW ON/OFF Status

RW Motor Current

RW Motor Power

RW Averaged Tach

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?