1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document prepared by the QS at the pre-contract stage outlines the quantities and descriptions of work to be completed?

Final Account

Billof Quantities (BQ)

Variation Order

Progress Claim

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the key responsibility of the QS at the post-contract stage?

Designing the building layout

Managing the tender process

Monitoring project costs and valuing variations

Preparing the bill of quantities

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the tendering process the QS is responsible for:

Evaluating tenders submitted by the Contractors

Supervising on-site construction activities

Preparing as-built drawings

Certifying payment claims

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At pre-contract stage, what is the primary role of a Quantity Surveyor?

Preparing the final account

Valuing work done on-site

Preparing cost estimates and tender documents

Inspecting construction quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does a QS ensure cost control at the early stage of the construction project?

By negotiating with suppliers

By preparing accurate cost estimates and conducting feasibility studies

By inspecting completed work

By reviewing contractor claims

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a Contractor submits a progress claim, the QS is responsible for:

Negotiating new contract terms

Preparing the contract documents

Inspecting health and safety standards

Reviewing and certifying the amount payable for work completed

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

QS plays a crucial role in risk management at the pre-contract stage by:

Managing site safety

Inspecting the contractor’s work

Identifying cost risks and providing mitigation strategies

Monitoring project timelines

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?