Roles of QS at Pre and Post Contract Stage

Roles of QS at Pre and Post Contract Stage

University

10 Qs

quiz-placeholder

Similar activities

STORMWATER MANAGEMENT

STORMWATER MANAGEMENT

University

10 Qs

Construction Technology Test Week 1-6

Construction Technology Test Week 1-6

University

10 Qs

construction

construction

University

8 Qs

Quiz on Legal & Statutory Requirements in Construction

Quiz on Legal & Statutory Requirements in Construction

University

7 Qs

Quiz on Legal & Statutory Requirements in Construction

Quiz on Legal & Statutory Requirements in Construction

University

14 Qs

MMC H&S Prefabrication

MMC H&S Prefabrication

University

9 Qs

110 Contract Quiz

110 Contract Quiz

University

10 Qs

Quality, Risk, D&B vs Traditional

Quality, Risk, D&B vs Traditional

University

8 Qs

Roles of QS at Pre and Post Contract Stage

Roles of QS at Pre and Post Contract Stage

Assessment

Quiz

Construction

University

Easy

Created by

NAQIYATUL 16963

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document prepared by the QS at the pre-contract stage outlines the quantities and descriptions of work to be completed?

Final Account

Billof Quantities (BQ)

Variation Order

Progress Claim

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the key responsibility of the QS at the post-contract stage?

Designing the building layout

Managing the tender process

Monitoring project costs and valuing variations

Preparing the bill of quantities

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the tendering process the QS is responsible for:

Evaluating tenders submitted by the Contractors

Supervising on-site construction activities

Preparing as-built drawings

Certifying payment claims

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At pre-contract stage, what is the primary role of a Quantity Surveyor?

Preparing the final account

Valuing work done on-site

Preparing cost estimates and tender documents

Inspecting construction quality

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does a QS ensure cost control at the early stage of the construction project?

By negotiating with suppliers

By preparing accurate cost estimates and conducting feasibility studies

By inspecting completed work

By reviewing contractor claims

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When a Contractor submits a progress claim, the QS is responsible for:

Negotiating new contract terms

Preparing the contract documents

Inspecting health and safety standards

Reviewing and certifying the amount payable for work completed

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

QS plays a crucial role in risk management at the pre-contract stage by:

Managing site safety

Inspecting the contractor’s work

Identifying cost risks and providing mitigation strategies

Monitoring project timelines

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?