Design and Build Project Strategies Quiz

Authored by RYAN SUN

Construction

University

Used 10+ times

Design and Build Project Strategies Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What sort of project best suits design, bid and build projects

Train station

Footpath

Home

Bridge

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are two advantages of the Design & Build strategy

Client has more control over the project

Single point of contact

Shortened project period

Quality control by client

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What price range does design and construct projects fall into?

500 thousand +

10-100Million

1-5Million

5-10Million

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Choose the incorrect answer-Traditional procurement is known for the following

Slower procurement process

Detailed design

Cooperative relationships

Low risk for client

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Select all the contracting strategies

Divide and conquer approach

Divided contract approach

Traditional approach

Design and build approach

6.

FILL IN THE BLANKS QUESTION

30 sec • 1 pt

Who is the client’s main point of contact in the traditional approach prior to tender.

(a)  

7.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

What are 2 of the disadvantages for the traditional approach

Architect takes lead

Design can be highly detailed

Slow decisions

Architects ignore budget

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?