Walls of Venice: The Costly Battle Against Flooding

Walls of Venice: The Costly Battle Against Flooding

Assessment

Interactive Video

Arts, Architecture, Engineering

10th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The MOSE project in Venice involves constructing barriers to protect the city from high tides. It includes 78 barriers with spares for maintenance. The project faced operational challenges due to severe weather conditions, requiring up to 15 workers for operations. Testing is ongoing, and the project will activate only under specific conditions threatening the city. Despite high costs, the project aims to preserve Venice's cultural heritage. Future plans include completing ancillary work and protecting Saint Mark's Cathedral from flooding. The project is expected to be fully operational by 2021.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why are there spare barriers for each lagoon entry in the Venice Lagoon?

To improve the aesthetic appearance of the lagoon

To reduce the cost of construction

To allow for periodic maintenance without leaving gaps

To increase the height of the barriers

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the MOSE floating barriers?

To enhance the beauty of the Venice Lagoon

To facilitate transportation across the lagoon

To protect Venice from high tides under specific conditions

To generate electricity for the city

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What structural issues do Venice's buildings face due to high tides?

They become more resistant to earthquakes

Their structural integrity is undermined by rotting brickwork and wood

Their foundations become stronger

They become more energy efficient

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

By when is the MOSE project expected to be fully operational?

By the end of 2023

By the end of 2022

By the end of 2021

By the end of 2020

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the estimated cost of the MOSE project?

€10 billion

€1 billion

€3 billion

€5 billion

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What unique feature does Saint Mark's Cathedral have?

Byzantine mosaics and an amazing crypt

A large bell tower

Gothic architecture

Modern glass windows

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional measure is being taken to protect Saint Mark's Square from flooding?

Inserting anti-reflux valves to stop reverse flow of high tides

Raising the ground level of the square

Building a new drainage system

Constructing a new barrier around the square