Search Header Logo

SP 3: GT Parts Development Guidelines SEM19 (post)

Authored by tnbgenco. talent

English

University

Used 15+ times

SP 3: GT Parts Development Guidelines SEM19 (post)
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is reverse engineering, and why is it important in part development?

To copy existing designs without permission from OEM or owner

To understand and replicate the functionality of a part.

To avoid using OEM parts entirely.

To bypass intellectual property laws such as myIPO

2.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Tick challenges commonly faced when purchasing OEM parts

Lack of technical drawings and material specifications.

High cost

Long lead time

None of the above.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the key elements of an Inspection and Test Plan (ITP)?

Standards, Acceptance criteria, Record, Responsibilities

Budget estimation, Supplier selection, Inspection

Marketing strategy, Distribution plan, Testing

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is due diligence critical when selecting a manufacturer for part development?

To ensure compliance with standards and capabilities.

To avoid legal challenges from OEMs.

To reduce costs and duration significantly

To minimize the need to conduct inspection by the end-user

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What information is typically included in the End of Manufacturing Data report?

Production methods, Materials used, Testing results

Marketing plans, Distribution networks, Sales data

Costing details, Budget approvals, Financial forecasts

None of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describe one effective strategy for conducting an IP search.

Searching relevant patent and trademark databases.

Avoiding IP searches to speed up development.

Consulting unrelated industries.

Ignoring existing patents.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the main stages involved in reverse engineering a part?

data collection, analysis, and first article manufacturing

Drawing, Manufacturing, Packaging, Selling

None of the above

Marketing, Sales, Reporting

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?