Path Testing Quiz

Path Testing Quiz

Professional Development

40 Qs

quiz-placeholder

Similar activities

UAS GANJIL MAPIL XI TEI TP 24/25

UAS GANJIL MAPIL XI TEI TP 24/25

11th Grade

40 Qs

OnShape Exam

OnShape Exam

12th Grade

39 Qs

CivilSphere Insights Quizzes

CivilSphere Insights Quizzes

University

40 Qs

Electrical Fault Finding 9

Electrical Fault Finding 9

12th Grade

42 Qs

Battel of Academic Excellence 2.O

Battel of Academic Excellence 2.O

University

42 Qs

U203Principles of manufacturing tech Quiz

U203Principles of manufacturing tech Quiz

12th Grade

35 Qs

8.5.1 - Mechanical Engineering - Key Terms and Discussion

8.5.1 - Mechanical Engineering - Key Terms and Discussion

10th Grade - University

41 Qs

Aerospace Machining Revision 3

Aerospace Machining Revision 3

KG - University

35 Qs

Path Testing Quiz

Path Testing Quiz

Assessment

Quiz

Engineering

Professional Development

Medium

Created by

Shaik Shakeer

Used 1+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the primary goal of Path Testing in software testing?

To test user interfaces for usability

To execute every possible path in the program at least once

To validate system performance under load

To ensure compatibility with multiple platforms

2.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In a Control Flow Graph, what does a 'Process Block' represent?

A branching decision point

A loop with multiple conditions

A straight-line sequence of statements without branches

A condition-based junction

3.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which of the following is NOT an element of a Control Flow Graph?

Process Blocks

Decisions

Junctions

Actors

4.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the main difference between a Flowchart and a Control Flow Graph?

A Flowchart includes detailed algorithm steps, while a Control Flow Graph focuses on control flow structure

A Flowchart is used for testing, while a Control Flow Graph is used for documentation

A Control Flow Graph includes actors, while a Flowchart does not

A Flowchart includes loops, while a Control Flow Graph does not

5.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the purpose of the 'Bug Assumption' in Path Testing?

To identify syntax errors in the program

To ensure that all program paths are free of bugs

To check if coding errors lead to unintended paths

To validate the user interface design

6.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which Path Testing criterion focuses on testing all decision points in a program?

Path Testing (Pinf)

Statement Testing (P1)

Branch Testing (P2)

Loop Testing

7.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In Path Testing, what are 'Nodes' and 'Links'?

Nodes represent variables, and Links represent their values

Nodes are decision points, and Links are connections between them

Nodes are classes, and Links are methods between classes

Nodes are external actors, and Links are system interactions

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?