Path Testing Quiz

Path Testing Quiz

Professional Development

40 Qs

quiz-placeholder

Similar activities

HF shhh

HF shhh

University

40 Qs

Aircraft and Physics

Aircraft and Physics

University

40 Qs

IED Unit 1 Quiz

IED Unit 1 Quiz

9th Grade

44 Qs

KL25-31301 - Kuis #1 (Manajemen Proyek Ganjil 2025/2026)

KL25-31301 - Kuis #1 (Manajemen Proyek Ganjil 2025/2026)

University

40 Qs

Final Examination for CPE 111(Computer Engr. as a Discipline)

Final Examination for CPE 111(Computer Engr. as a Discipline)

University

36 Qs

Final Exam- 8th Applied Engineering

Final Exam- 8th Applied Engineering

8th Grade

37 Qs

L2 C4 PNEUMATIC SYSTEM

L2 C4 PNEUMATIC SYSTEM

University

40 Qs

GW2 Mock 1

GW2 Mock 1

University - Professional Development

41 Qs

Path Testing Quiz

Path Testing Quiz

Assessment

Quiz

Engineering

Professional Development

Practice Problem

Medium

Created by

Shaik Shakeer

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the primary goal of Path Testing in software testing?

To test user interfaces for usability

To execute every possible path in the program at least once

To validate system performance under load

To ensure compatibility with multiple platforms

2.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In a Control Flow Graph, what does a 'Process Block' represent?

A branching decision point

A loop with multiple conditions

A straight-line sequence of statements without branches

A condition-based junction

3.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which of the following is NOT an element of a Control Flow Graph?

Process Blocks

Decisions

Junctions

Actors

4.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the main difference between a Flowchart and a Control Flow Graph?

A Flowchart includes detailed algorithm steps, while a Control Flow Graph focuses on control flow structure

A Flowchart is used for testing, while a Control Flow Graph is used for documentation

A Control Flow Graph includes actors, while a Flowchart does not

A Flowchart includes loops, while a Control Flow Graph does not

5.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the purpose of the 'Bug Assumption' in Path Testing?

To identify syntax errors in the program

To ensure that all program paths are free of bugs

To check if coding errors lead to unintended paths

To validate the user interface design

6.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which Path Testing criterion focuses on testing all decision points in a program?

Path Testing (Pinf)

Statement Testing (P1)

Branch Testing (P2)

Loop Testing

7.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In Path Testing, what are 'Nodes' and 'Links'?

Nodes represent variables, and Links represent their values

Nodes are decision points, and Links are connections between them

Nodes are classes, and Links are methods between classes

Nodes are external actors, and Links are system interactions

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?