Path Testing Quiz

Path Testing Quiz

Professional Development

40 Qs

quiz-placeholder

Similar activities

World Youth Skills Day 2025

World Youth Skills Day 2025

KG - University

35 Qs

Chemical Engineering Vocabulary - Principles of Engineering

Chemical Engineering Vocabulary - Principles of Engineering

10th Grade

35 Qs

SM: Wheel and Axle

SM: Wheel and Axle

10th Grade

42 Qs

Snap Circuits

Snap Circuits

7th Grade

39 Qs

LV0506 Inspecting Vehicles - 40Q Mock

LV0506 Inspecting Vehicles - 40Q Mock

KG - University

40 Qs

Technology Quiz, Chapter 4, Structures, Sollutions to problems

Technology Quiz, Chapter 4, Structures, Sollutions to problems

8th Grade

39 Qs

BME MCQ CAT-III

BME MCQ CAT-III

University

40 Qs

Path Testing Quiz

Path Testing Quiz

Assessment

Quiz

Engineering

Professional Development

Practice Problem

Medium

Created by

Shaik Shakeer

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the primary goal of Path Testing in software testing?

To test user interfaces for usability

To execute every possible path in the program at least once

To validate system performance under load

To ensure compatibility with multiple platforms

2.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In a Control Flow Graph, what does a 'Process Block' represent?

A branching decision point

A loop with multiple conditions

A straight-line sequence of statements without branches

A condition-based junction

3.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which of the following is NOT an element of a Control Flow Graph?

Process Blocks

Decisions

Junctions

Actors

4.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the main difference between a Flowchart and a Control Flow Graph?

A Flowchart includes detailed algorithm steps, while a Control Flow Graph focuses on control flow structure

A Flowchart is used for testing, while a Control Flow Graph is used for documentation

A Control Flow Graph includes actors, while a Flowchart does not

A Flowchart includes loops, while a Control Flow Graph does not

5.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

What is the purpose of the 'Bug Assumption' in Path Testing?

To identify syntax errors in the program

To ensure that all program paths are free of bugs

To check if coding errors lead to unintended paths

To validate the user interface design

6.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

Which Path Testing criterion focuses on testing all decision points in a program?

Path Testing (Pinf)

Statement Testing (P1)

Branch Testing (P2)

Loop Testing

7.

MULTIPLE CHOICE QUESTION

1 min • 5 pts

In Path Testing, what are 'Nodes' and 'Links'?

Nodes represent variables, and Links represent their values

Nodes are decision points, and Links are connections between them

Nodes are classes, and Links are methods between classes

Nodes are external actors, and Links are system interactions

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?