TPM #2

TPM #2

Professional Development

8 Qs

quiz-placeholder

Similar activities

Clinical Laboratory Personnel (NETI)

Clinical Laboratory Personnel (NETI)

Professional Development

10 Qs

TR10 Critical Procedure Refresher

TR10 Critical Procedure Refresher

Professional Development

11 Qs

End of term quiz

End of term quiz

Professional Development

12 Qs

TPM

TPM

Professional Development

7 Qs

OEE

OEE

Professional Development

10 Qs

RCM Recap Day 3

RCM Recap Day 3

Professional Development

9 Qs

mcq1-7

mcq1-7

Professional Development

10 Qs

Flight Preparation & Flight Plan Quiz

Flight Preparation & Flight Plan Quiz

Professional Development

10 Qs

TPM #2

TPM #2

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Wilson Chia

Used 1+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_______ is work on specific problem or area

Planned Maintenance

Quality Maintenance

Early Equipment Management

Focused Maintenance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

_____ is a work station and tools design to minimize physical strain and fatique

6S

Zero Acidents

Ergonomics

Safety Measures

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is NOT in the Six Big Losses in TPM ?

Breakdown

Reduced Speed

Acidents

Reduced Yield

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is OEE ?

Overall Equipment Effectiveness

Overall Equipment Engineering

Overall Equipment Efficiency

Overall Equipment Evaluation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The percentage % calculation of OEE = ________ ?

Availability x Productivity x Quality

Availability x Performance x Quantity

Availability x Performance x Quality

Availability x Productivity x Quantity

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Takt Time ?

Total Conversion Time / Customer Requirement

Lead Time / Customer Requirement

Time to complete One Unit / Customer Requirement

Effective Working Time / Customer Requirement

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Preventive Maintenance is an action taken to fix the breakdown _______

after it happened

before it happen

in the future

in specific area

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a Sporadic Losses ?

It is ongoing events losses

It is common events losses

It is unexpected events losses

It is predicted events losses