Construction Site Planning Quiz  B

Construction Site Planning Quiz B

Vocational training

20 Qs

quiz-placeholder

Similar activities

Cold Water Storage Cistern

Cold Water Storage Cistern

KG - University

15 Qs

Plumbing L1 Baseline assessment

Plumbing L1 Baseline assessment

12th Grade

20 Qs

PRE TEST TRAINING PAA - LIFTING RIGGING

PRE TEST TRAINING PAA - LIFTING RIGGING

Professional Development

15 Qs

UNIT 04 FINAL

UNIT 04 FINAL

KG - University

20 Qs

Health & Safety 1

Health & Safety 1

9th Grade

16 Qs

PROJECT TEAM BUILDING & RIBA

PROJECT TEAM BUILDING & RIBA

KG - University

15 Qs

Cavity Walling L1 A

Cavity Walling L1 A

KG - University

20 Qs

Math in construction 1

Math in construction 1

11th Grade

16 Qs

Construction Site Planning Quiz  B

Construction Site Planning Quiz B

Assessment

Quiz

Construction

Vocational training

Practice Problem

Medium

Created by

John North

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing would be used to show streets, roads and buildings?

Front elevation.

Location plan.

Building plan.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used on a location plan?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should the length of a wall be found from a site plan?

Reading the drawing dimensions.

Counting the number of bricks.

Using a set square.

Using a storey rod.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must existing electrical services be located before site work begins?

To prevent damage to the services.

To allow maintenance work to be carried out.

To ensure cables are exposed.

To cover them with concrete for protection.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should site clearance take place?

To help the Building Inspector check that the site is safe.

To reduce the cost of removing the topsoil.

To allow materials to be delivered.

To remove vegetation.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following describes the building line?

A line from which setting out will be taken, approved by the Local Authority.

The centre line of a proposed building.

A line from which setting out will be taken, approved by the HSE.

The centre line of an existing building.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting out a right angled corner, which ratio should be used?

7:8:9

4:5:6

3:4:5

1:2:3

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?