Construction Site Planning Quiz  B

Construction Site Planning Quiz B

Vocational training

20 Qs

quiz-placeholder

Similar activities

306 hot water systems 2 Quiz

306 hot water systems 2 Quiz

2nd Grade - University

20 Qs

Bpec Level 1 Key features of domestic plumbing systems Part 1

Bpec Level 1 Key features of domestic plumbing systems Part 1

KG - University

22 Qs

Relationship !

Relationship !

KG - University

20 Qs

Construction Drawing Quiz 102 A

Construction Drawing Quiz 102 A

12th Grade

20 Qs

210 Quiz 1

210 Quiz 1

KG - University

20 Qs

Understand how to set up and secure work areas (3)

Understand how to set up and secure work areas (3)

Professional Development

15 Qs

Unit 202 revision

Unit 202 revision

12th Grade

23 Qs

Rain Water

Rain Water

KG - University

21 Qs

Construction Site Planning Quiz  B

Construction Site Planning Quiz B

Assessment

Quiz

Construction

Vocational training

Medium

Created by

John North

Used 14+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What drawing would be used to show streets, roads and buildings?

Front elevation.

Location plan.

Building plan.

Section through.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which scale is commonly used on a location plan?

1:5

1:100

1:250

1:2500

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should the length of a wall be found from a site plan?

Reading the drawing dimensions.

Counting the number of bricks.

Using a set square.

Using a storey rod.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must existing electrical services be located before site work begins?

To prevent damage to the services.

To allow maintenance work to be carried out.

To ensure cables are exposed.

To cover them with concrete for protection.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should site clearance take place?

To help the Building Inspector check that the site is safe.

To reduce the cost of removing the topsoil.

To allow materials to be delivered.

To remove vegetation.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following describes the building line?

A line from which setting out will be taken, approved by the Local Authority.

The centre line of a proposed building.

A line from which setting out will be taken, approved by the HSE.

The centre line of an existing building.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When setting out a right angled corner, which ratio should be used?

7:8:9

4:5:6

3:4:5

1:2:3

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?