Soundness Testing Quiz

Soundness Testing Quiz

12th Grade

47 Qs

quiz-placeholder

Similar activities

Automotive Transmission Systems: Clutches

Automotive Transmission Systems: Clutches

12th Grade

48 Qs

Weather

Weather

9th - 12th Grade

45 Qs

6035 Site Prep Quiz 2

6035 Site Prep Quiz 2

12th Grade

44 Qs

HVAC 1 FALL 2024  FINALS

HVAC 1 FALL 2024 FINALS

12th Grade

49 Qs

Quiz Teknik Dasar Otomotif

Quiz Teknik Dasar Otomotif

11th Grade - University

52 Qs

A&P Cardiovascular System Wk 4 & 5 Test Review

A&P Cardiovascular System Wk 4 & 5 Test Review

11th Grade - University

50 Qs

Level 2 - Hot Water MEGA QUIZ

Level 2 - Hot Water MEGA QUIZ

12th Grade

42 Qs

ESS Weather Review

ESS Weather Review

10th Grade - University

43 Qs

Soundness Testing Quiz

Soundness Testing Quiz

Assessment

Quiz

Other

12th Grade

Medium

Created by

Stephen Morgan

Used 1+ times

FREE Resource

47 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked during a visual inspection before soundness testing?

Open ends, soldered joints, compression joints, clips

Only soldered joints

Only compression joints

Only clips

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of pipes require different soundness tests?

Rigid pipe (copper and steel) and plastic pipe

Only copper pipes

Only steel pipes

Only plastic pipes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Test period

Visual inspection

Final check

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the test period in the testing and decommissioning process?

Visual inspection

Set up equipment

Complete documentation

Final check

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing and decommissioning process?

Final check

Complete documentation

Test period

Set up equipment

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the soundness testing of a rigid pipe system?

Attach the hydraulic test bucket

Slowly fill the system with water

Pump system up to 1.5 times the working pressure

Check for any pressure drop

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long should the system be left to stand for temperature stabilization during soundness testing?

10 minutes

20 minutes

30 minutes

40 minutes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?