1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The statutory requierments of heating and hot water system commissioning are covered under the ?

Construction regulations.

Britsish standards.

Water regulations.

Building regulations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Details of the heat output for a specific heat emitter can be found in?

The British standards.

Manufacturer's catalogues.

The WRAS guide.

The building regulations.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A disadvantage of using a one pipe heating system is that?

It is not possible to use thermostatic radiator valves(TRV's)

The central heating pump must always be on the return.

Accurate balancing of the heat emitters is essential.

The pipework to the radiator must be 22mm.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Filling a fully indirect open vented central heating system would be carried out through?

The cold feed and exspansion cistern.

A flexible connection from the incoming water mains.

The cold fee from the cold water storage cistern.

A connection between the mains and drain off tap.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The velocity for a circulation pump on a micro bore central heating must not exceed?

1 m/s

1.4m/s

1.5m/s

1.8m/s

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 3 port valve, programmer, room thermostat, cylinder thermostate, and TRV's would normally be used on?

Pumped heating and gravity hot water for a two pipe system.

Pumped heating and gravity hot water for a one pipe system.

A fully pumped heating system(hot water priority) using a two position zone valve.

A fully pumped central heating system using a 3 port mid position valve.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On a fully pumped system, an automatic air release valve is usally installed at the?

Highest point on the pumped primary flow.

Lowest point on the pumped primary return.

Point where the open vent enters the F&E cistern.

On the oposite end to the TRV on a radiator.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?