What is the maximum distance between the open vent and cold feed on an H-frame?

Central Heating System Quiz

Quiz
•
Construction
•
KG
•
Medium

romin gouran
Used 12+ times
FREE Resource
48 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
100mm
125mm
150mm
175mm
Answer explanation
The maximum distance between the open vent and cold feed on an H-frame is specified as 150mm. This ensures proper functionality and efficiency in the system, making 150mm the correct choice.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the most suitable position for the installation of an expansion vessel within a central heating system?
On the flow pipe near to the boiler
On the return pipe near to the boiler
On the cold feed pipe to the system
On the open vent pipe
Answer explanation
The expansion vessel should be installed on the return pipe near to the boiler to effectively manage pressure changes and accommodate thermal expansion, ensuring optimal system performance.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What item allows the individual control of hot water and central heating timing?
Boiler
Two port valve
Room stat
Programmer
Answer explanation
The programmer is the device that allows users to set specific times for heating and hot water, providing control over when these systems operate. This makes it the correct choice for managing heating schedules.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
An S-plan system has what type of valve controlling the hot water and central heating circuits?
Three port valve
Mid position valve
Two port valves
Gravity circulation
Answer explanation
An S-plan system uses two port valves to control the flow of hot water to either the heating circuit or the hot water circuit, allowing for efficient operation without the need for a mid-position valve.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When the zone valve closes, the boiler switches off and the circulator stops running, but the programmer is still on; this is known as…
Boiler interlock
Boiler cycling
Boiler overheating
Boiler lockout
Answer explanation
When the zone valve closes, it signals the boiler to stop heating, which is a function of the boiler interlock system. This ensures that the boiler and circulator only operate when needed, preventing unnecessary energy use.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Look at the image in the Question above. How is the heating system piped?
One-pipe
One-pipe reverse return
Two-pipe
Two-pipe reverse return
Answer explanation
The heating system is piped as a two-pipe system, which consists of separate pipes for supply and return of water, allowing for more efficient heating and better temperature control compared to one-pipe systems.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the recommended maximum surface temperature for heat emitters in schools and NHS properties?
42 degrees
43 degrees
45 degrees
53 degrees
Answer explanation
The recommended maximum surface temperature for heat emitters in schools and NHS properties is 43 degrees. This limit helps ensure safety and comfort for occupants.
Create a free account and access millions of resources
Similar Resources on Quizizz
45 questions
unit 103 powerpoint 2 Energy Use in Dwellings Quiz

Quiz
•
10th Grade
53 questions
Radiator Standards Quiz

Quiz
•
12th Grade
53 questions
Plumbing Maintenance Quiz

Quiz
•
12th Grade
50 questions
EPA Knowledge Assessment – Sample Questions 2

Quiz
•
KG - University
50 questions
GMJ 6035 Hot Water - 50 questions based on the handbook

Quiz
•
KG - University
48 questions
Cold Water PowerPoint 6

Quiz
•
KG - University
50 questions
Condenser Unit Quiz

Quiz
•
12th Grade
46 questions
Hot Water Systems Quiz

Quiz
•
KG - University
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade
Discover more resources for Construction
10 questions
Identifying equations

Quiz
•
KG - University
15 questions
Music 2016

Quiz
•
KG - 12th Grade
44 questions
logos

Quiz
•
KG - University
20 questions
Disney Characters

Quiz
•
KG
20 questions
Kids shows

Quiz
•
KG
20 questions
Guess that Disney

Quiz
•
KG - 5th Grade
20 questions
Cartoon Characters!

Quiz
•
KG - 5th Grade