Testing and Inspection Questions

Testing and Inspection Questions

Vocational training

30 Qs

quiz-placeholder

Similar activities

wle final

wle final

12th Grade

30 Qs

Unit 012 understand inspection, testing (Revision)

Unit 012 understand inspection, testing (Revision)

KG - University

35 Qs

System Components quiz

System Components quiz

12th Grade - University

26 Qs

04C Circuits (5357)

04C Circuits (5357)

KG - University

25 Qs

012 Sample Evolve questions (B)

012 Sample Evolve questions (B)

KG - University

35 Qs

Cables and installation Level 2

Cables and installation Level 2

KG - University

25 Qs

Electrical Scientific Principles Level 3

Electrical Scientific Principles Level 3

KG - University

30 Qs

R.W CHAPTER 1 QUIZ

R.W CHAPTER 1 QUIZ

11th Grade

32 Qs

Testing and Inspection Questions

Testing and Inspection Questions

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Justin Ferris

Used 2+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of initial verification in BS 7671?

To ensure the installation is aesthetically pleasing

To confirm the installation complies with safety standards

To check the installation’s energy efficiency

To verify the installation’s cost-effectiveness

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following tests is NOT part of the initial verification process?

Continuity of protective conductors

Insulation resistance

Earth fault loop impedance

Energy consumption measurement

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS 7671, what is the maximum permissible disconnection time for a final circuit with a rating not exceeding 32 A in a TN system?

0.4 seconds

1 second

5 seconds

10 seconds

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum insulation resistance value for a 230V circuit as per BS 7671?

0.5 MΩ

1 MΩ

2 MΩ

5 MΩ

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which document must be provided to the client upon completion of an electrical installation according to BS 7671?

Energy Performance Certificate

Electrical Installation Certificate

Building Regulations Compliance Certificate

Warranty Certificate

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the earth fault loop impedance test?

To measure the resistance of the earth electrode

To ensure the protective device will operate within the required time

To check the continuity of the circuit conductors

To verify the polarity of the installation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a requirement for periodic inspection and testing?

It must be carried out every 10 years

It must be carried out by the installation owner

It must be carried out by a competent person

It must be carried out only when a fault is suspected

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?