012 Sample Evolve questions (A)

012 Sample Evolve questions (A)

Vocational training

43 Qs

quiz-placeholder

Similar activities

5357 001 Mock 3

5357 001 Mock 3

12th Grade

40 Qs

202: Principles of electrical science Mock Exam 1

202: Principles of electrical science Mock Exam 1

12th Grade

40 Qs

rainwater / guttering ph2

rainwater / guttering ph2

1st Grade

45 Qs

312 - Electrical supplies to the property

312 - Electrical supplies to the property

12th Grade

47 Qs

LB1 A GAS

LB1 A GAS

Professional Development

43 Qs

Electric Terms Quiz

Electric Terms Quiz

8th Grade

43 Qs

PPT Functional testing of electrical components within plumbing

PPT Functional testing of electrical components within plumbing

Professional Development

44 Qs

NETK3/08 Mock A

NETK3/08 Mock A

KG - University

40 Qs

012 Sample Evolve questions (A)

012 Sample Evolve questions (A)

Assessment

Quiz

Construction

Vocational training

Medium

Created by

Ross Howell

Used 8+ times

FREE Resource

43 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following should an instrument comply with when testing a 230v single phase installation?

BS EN 61010

HSE GS 38

HSE GN3

BS EN 60309-2

Answer explanation

HSE GS 38 outlines safety guidelines for electrical testing instruments, ensuring they are suitable for use in 230v single phase installations. This makes it the correct choice for compliance in this context.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which test confirms BS 7671 for ADS have been met?

Earth fault loop impedance

Prospective Fault current

RCD Test

Phase rotation

Answer explanation

The Earth fault loop impedance test confirms that the requirements of BS 7671 for Automatic Disconnection of Supply (ADS) are met, ensuring safety by verifying the effectiveness of the earthing system.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the purpose of the integral test button on an RCD?

To confirm function of mechanical parts

To ensure it disconnects at the specified current

To isolate the RCD prior to carrying out instrument tests

To test the RCD

Answer explanation

The integral test button on an RCD is primarily used to confirm the function of mechanical parts, ensuring that the device operates correctly when needed. This is crucial for safety and reliability.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one is used to establish phase sequencing for an installation?

Frequency meter

Power factor indicator

Rotating disk instrument

EFLI Tester

Answer explanation

A rotating disk instrument is specifically designed to establish phase sequencing by indicating the direction of rotation, which helps in determining the correct phase sequence for electrical installations.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The breaking capacity of a protective device must

Exceed the IPF

Exceed PEFC but not PSCC

Not exceed IPF

Not exceed PEFC but exceed PSCC

Answer explanation

The breaking capacity of a protective device must exceed the IPF (Initial Prospective Fault Current) to ensure it can safely interrupt fault currents without failure, making 'Exceed the IPF' the correct choice.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Having completed a test of prospective fault current at the origin of an installation, the results should be compared to?

Breaking capacity of the main protective device

Breaking capacity of the main isolator

Nominal current rating of the main protective device

Nominal voltage

Answer explanation

The results of the prospective fault current test should be compared to the breaking capacity of the main protective device to ensure it can safely interrupt the fault current without failure.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The prospective fault current for a single phase electrical installation is measured between line - earth and line – neutral. The reading on the certificate is

Line – earth

Line – Neutral

Highest value of the two

Lowest value of the two

Answer explanation

The prospective fault current is determined by measuring both line-earth and line-neutral. The highest value of the two readings indicates the maximum fault current that could occur, making 'Highest value of the two' the correct choice.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?