QRA1

QRA1

Professional Development

12 Qs

quiz-placeholder

Similar activities

FIRE Board

FIRE Board

Professional Development

11 Qs

EE 030 S2

EE 030 S2

Professional Development

10 Qs

Basic Occupational Health & Safety

Basic Occupational Health & Safety

Professional Development

15 Qs

Motor Protection Quiz

Motor Protection Quiz

Professional Development

8 Qs

Quiz on Group Technology

Quiz on Group Technology

Professional Development

15 Qs

Configuring the Timeline Control and Creating Card Forms

Configuring the Timeline Control and Creating Card Forms

Professional Development

10 Qs

QA ISO 9001: 2015

QA ISO 9001: 2015

Professional Development

10 Qs

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Maintenance of Roads and Bridges, Project Quality Assurance DPWH

Professional Development

10 Qs

QRA1

QRA1

Assessment

Quiz

Engineering

Professional Development

Medium

Created by

mohamed mostafa

Used 1+ times

FREE Resource

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

In which phase is a Preliminary QRA conducted to compare design options?

Detailed Engineering Phase

Basic Engineering / FEED Phase

Evaluation / Concept Selection Phase

Operation Phase

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which tool is commonly used in QRAs for modeling sequential event scenarios?

Fault Tree Analysis (FTA)

HAZID

Process Flow Diagram (PFD)

Event Tree Analysis (ETA)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of an Assumption Register in QRA studies?

To document conservative assumptions used during the study

To replace missing data with generic inputs

To define safety barriers for facility operations

To summarize the key findings of risk analysis

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which atmospheric condition is classified as "very unstable" in the Pasquil Stability Classes?

Class C

Class F

Class A

Class F

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following is NOT typically part of a QRA consequence analysis?

Ignition probability modeling

Jet fire heat radiation analysis

Societal risk assessment

Financial loss estimation

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the main function of the Scope of Work (SOW) in a QRA study?

To estimate event frequencies

To define the objective, boundaries, and deliverables of the study

To validate the assumptions register

To conduct vulnerability analysis

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of an Event Tree Analysis (ETA) in QRA?

To evaluate potential event sequences after an initiating event

To identify all possible ignition sources in a facility

To model failure frequencies of equipment

To document all assumptions made during the QRA

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?