Value Engineering

Value Engineering

12th Grade

15 Qs

quiz-placeholder

Similar activities

TECH WHIZ

TECH WHIZ

University

15 Qs

NLP Quizz Unit-3

NLP Quizz Unit-3

University

14 Qs

PLTW EOC Eng Ess Test Review 3

PLTW EOC Eng Ess Test Review 3

9th - 12th Grade

20 Qs

TUTORIAL 4-BEARING_Part A

TUTORIAL 4-BEARING_Part A

University

10 Qs

Mini Quiz English for Engineer

Mini Quiz English for Engineer

University

12 Qs

Aplikasi Web Stateful

Aplikasi Web Stateful

12th Grade

15 Qs

Digital Electronics Quiz -U1-U2

Digital Electronics Quiz -U1-U2

University

15 Qs

COA-Introduction-Assessment

COA-Introduction-Assessment

University

10 Qs

Value Engineering

Value Engineering

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Medium

Created by

Leah Scott

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose or intended use of a product or service?

Value Analysis

Life Cycle Costing

Function

Cost

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Off-Site pre fabrication is a method to achieve what in Value Engineering?

Increase on site labour

Extended Project Timelines

Reduce on-site labour and construction time

Increase Material usage

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary objective of Value Engineering?

Deliver necessary functions at the lowest cost

Increase Project Complexity

Increase material use

Extended Project timelines

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common method to enhance sustainability in Value Engineering?

Using non-renewable resources

Implementing energy-efficient systems

Increase Project Scope

Reducing Project timelines

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a key consideration in Value Engineering

Recycled Materials

Energy Efficiency

Colour Scheme

Waste Minimisation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which point does not relate to Value Engineering

New Projects

Affordable Prices

Modification or Substitution

Less Effort

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which stage of a product's life cycle is target cost determined?

Planning and Marketing

Product Development

Concept Design

Product Design

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?