Cold Water - Mock Exam

Cold Water - Mock Exam

12th Grade

57 Qs

quiz-placeholder

Similar activities

EPA 608 - TYPE 3

EPA 608 - TYPE 3

9th - 12th Grade

52 Qs

Flow Rate Inspection Quiz

Flow Rate Inspection Quiz

12th Grade

58 Qs

8202-525 March 2018

8202-525 March 2018

12th Grade

60 Qs

Cardiovascular Review

Cardiovascular Review

10th - 12th Grade

58 Qs

Water Regulations Quiz

Water Regulations Quiz

12th Grade

53 Qs

Immersion Heaters Quiz

Immersion Heaters Quiz

12th Grade

58 Qs

Level 2 - Cold Water MEGA QUIZ

Level 2 - Cold Water MEGA QUIZ

12th Grade

62 Qs

Level 2 - Plumbing Processes MEGA QUIZ

Level 2 - Plumbing Processes MEGA QUIZ

12th Grade

59 Qs

Cold Water - Mock Exam

Cold Water - Mock Exam

Assessment

Quiz

Other

12th Grade

Medium

Created by

Adam Dreifuss

Used 34+ times

FREE Resource

57 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Details of the minimum amount of headroom required above a Cold Water Storage Cistern, to enable maintenance work, can be found in the

Installation plan

Construction Regulations

Job specification

Water Regulations Guide

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum diameter of an incoming cold water service pipe to a dwelling is

15 mm

12 mm

22 mm

28 mm

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The incoming water flow rate to a property has been confirmed as 6 litres / minute. What is this reading in litres / second?

0.06 l / s

0.1 l / s

0.12 l / s

0.6 l / s

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is not approved for use in Cold Water Systems installation?

Push fit copper fittings.

Solder fittings with lead solder.

Type ‘A’ compression fittings.

Type ‘B’ compression fittings.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Cold Water System where all cold water draw-off points, except the draw-off point at the sink, are fed from a storage cistern is called

a Direct Cold Water System

an Indirect Cold Water System

a Combined Cold Water System

a Secondary Cold Water System

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Cold Water Service pipe to a dwelling should be laid between

550 mm and 1000 mm below ground level

650 mm and 1350 mm below ground level

750 mm and 1350 mm below ground level

750 mm and 2000 mm below ground level

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The correct tool for cutting holes in a plastic Cold Water Storage cistern is a

keyhole saw

hole saw

pre-heated piece of copper pipe

sharpened piece of steel pipe

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?